When the grouting pipe is laid, it shall be kept flat and tight without wrinkling, so that the grouting pipe has effective tension. After laying, it shall be rolled again with a clean steel wheel roller. Most urban roads use glass fiber grouting pipes with self-adhesive. The diameter of the glass fiber grouting pipe is . ~ times of the maximum particle size of the asphalt concrete surface aggregate. The ultimate tensile strength should be greater than kN / m, so as to give play to the anti reflection crack performance of the glass fiber grouting pipe. It can also ensure the shear resistance and adhesive force of the adhesive layer of the glass fiber grouting pipe. The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip,FumentoTunnel combined hollow anchor manufacturer, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use, and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again.Fumento, The grouting pipe has good flexibility. When the pipe is produced, it can be coiled so that the number of joints in the pipe network can be reduced. It can be laid according to the terrain, easily bypass obstacles, and is convenient for construction.The research shows that the friction between the grouting pipe and the soil is also greatly related to the water content and compactness of the soil. The grouting pipe itself has a pattern, and is also a grid like integral geo reinforced material, so the friction between the grouting pipe and the medium is very large; The grouting pipe also has a great tensile strength, a large deformation modulus, and the reinforcement is stable and uniform, which can see good results in a short time. It can be seen from the experiment that the mesh reinforcement performance of the grouting pipe is better than the strip reinforcement material, which increases the stability of the project; The grouting pipe is especially suitable for the construction of high-speed highways, because the action force of the back and forth traffic on the soil is very great, and the grouting pipe can share the stress, increase the deformation modulus of the soil, effectively enhance the strength of the soil, and achieve the effect of stabilizing the project and long-term use.ELFORD,They shall be connected as a whole in the factory as far as possible. If it is necessary to connect on site due to manufacturing process, transportation conditions, etc., hot press vulcanization (grouting pipe) or welding (plastic grouting pipe) shall be used. The joint appearance shall be smooth and smooth, and the tensile strength shall not be less than % of the base metal. The so-called 'overlapping' without any treatment is absolutely not allowed. All kinds of cross connection points of grouting pipes shall be made of accessories produced by our new rubber products factory, so as to ensure that on-site connection is only carried out in straight sections during construction. Flexible material with sufficient deformation capacity and good adhesion with concrete. The bottom of the horseshoe of the grouting pipe is too low. After the horseshoe is seated in the mold, the space between the outer mold and the horseshoe surface is greater than the thickness of the pipe wall.When the pipe cannot be connected due to serious blockage the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Other uses of grouting pipe introduction the grouting pipe of pile foundation refers to the steel pipe that needs to be embedded when testing the quality of pile foundation. Generally, it is bound in the reinforcement cage and lowered into the hole together with the reinforcement cage before pouring concrete! There are many reasons for the grouting pipe to gamble on the pipe, most of which are due to the leakage of slurry caused by the pipe joint not being welded well during processing, and also due to the pipe mouth not being closed well and falling debris, the pipe is blocked! To put it bluntly, the transducer can not be put in, or can not be placed at the bottom of the pile, so it is impossible to comprehensively test the whole pile and judge the quality of the pile foundation!


FumentoGrouting small conduitWhat does it generally include



Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile,FumentoSeamless small conduit,FumentoSupport advance small conduit, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap such as greatly improving the pile side friction resistance After the test of each group of test tubes is completed, the test points shall be sampled for % at random, and the relative standard deviation of sound time shall not be greater than %; The relative standard deviation of amplitude shall not be greater than %.In the engineering practice, some construction units directly pave the glass fiber grouting pipe after spraying the sticky layer oil, and the roller rolls after it. The effect is good, and the glass fiber grouting pipe is not easy to wave. Strictly control the entry and exit of vehicles transporting the mixture, brake and dump the leftover mixture on the grouting pipe layer to prevent damage to the glass fiber grouting pipe; The back glue of glass fiber grouting pipe is easily soluble in water, which is easy to irritate human skin. Construction personnel must wear protective gloves; When the grouting pipe is laid, the temperature of the road surface is required to be between . Therefore, the relative displacement trend or relative displacement will occur between the narrow two, which will then generate friction. This friction is generally called 'surface friction'.Honesty and mutual benefit,Advantages: It is connected with special hydraulic tongs, does not require any equipment, is convenient and fast ( times faster than the traditional welding method), is simple to fix the grouting pipe to the reinforcement cage, and is not affected by the bad weather.The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Disposal method: the grouting pipe shall be shortened according to the specification.


FumentoGrouting small conduitWhat does it generally include



There are many forms of grouting pipes that can be improved and applied. Although the engineering pipeline system is very complex, any complex pipe system can be divided into several relatively simple individual pipe sections through the setting of fixed pipe racks. When selecting the corrugated grouting pipe, the deformation compensation of the pipe system can be determined according to these relatively simple pipe sections, so as to select the grouting pipe.build,In limestone area, the punching is not good, and it is difficult to sink the reinforcement cage. When the grouting pipe is deformed and blocked by unconventional means, the pipe is blocked due to the workers&#; carelessness and falling into small concrete blocks. The deformation and blockage of the grouting pipe bring great difficulties to the detection work, and even can not be detected. Therefore, when the grouting pipe is found blocked after the foundation pile is poured and before the inspection, effective measures should be taken to pass the pipe to ensure the smooth progress of ultrasonic inspection. Generally, there are three methods for passing the pipe: stabbing the grouting pipe with thick and long reinforcement, flushing and pigging with high-pressure water, and using a drill with a small drill to clean the hole. Verify the water permeability of the rock stratum according to the measured water absorption of the borehole to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration. It is a thermoplastic material, which can be processed and formed many times,The bi-directional tensile plastic mesh false roof used in underground coal mine with mine grouting pipe is specially designed and manufactured for the false roof support of underground coal mining face and roadway wall support. It is made of several high molecular polymers and filled with other modifiers through heating, extrusion, molding, punching, stretching, shaping, coiling and other processes. Compared with metal textile mesh and plastic woven mesh, it has light weight, high strength, isotropy, and antistatic, It is a new type of mesh grouting pipe material for underground coal mine support engineering and civil engineering.Among the many imported projects, the development of the production technology of automobile door and window sealing strips is the most representative. Through the introduction of sealing strip production lines from Japan, Germany, Italy, Britain and other countries, up to now domestic manufacturers have introduced more than sealing strip production lines. In addition to pure rubber sealing strips, sealing strips of various composite structures metal skeleton and various rubber composite sealing strips, rubber and plastic composite sealing strips can be produced. At present, the overall level of China&#;s sealing strip production technology has basically reached the level of foreign countries in the s, and has become a grouting pipe. Because some projects are not easy to detect when they are manufactured, and the quality of the grouting pipe as a channel for testing instruments has become crucial. If the quality of the grouting pipe is poor, it will bring many hidden dangers. Steel grouting pipe material, which has the characteristics of thin pipe wall, steel saving impermeability, is generally used for post tensioned reserved holes in prestressed structures. When the grouting pipe is used, it can be directly bound to the reinforcement framework. Because the grouting pipe is very light, it is very convenient to operate. However, attention should be paid to the balance of its axis during installation.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used, a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.


404 Not Found

404 Not Found


nginx

Related articles

FumentoGrouting small conduitWhat does it generally include

FumentoGrouting small conduitWhat does it generally include

The grouting pipe is a patented product. Compared with similar products in the market, it has highe...

评论列表

881HP198728332
2023-09-12 10:21:05

After receiving the goods, I feel that the quality FumentoGrouting small conduit is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

237HP184976196
2023-09-12 10:50:13

I just received it in the morning and my friends like it very much. I will buy it from you next time FumentoGrouting small conduit.

224HP159430236
2023-09-12 10:28:25

I finally received what I needed FumentoGrouting small conduit, the stuff is very good, the price is good and the price is cheap, thank you boss! To be honest, this is my most satisfying shopping experience. Whether it is the attitude of the store or the items, I am very satisfied. The attitude of the store is very professional and enthusiastic, answering all questions, and the response is very fast. I asked a lot of questions, and he did not feel annoying, and he would answer me seriously. For this, I would like to express my sincere respect to you. There are not many good stores like this. .

60HP184127502
2023-09-12 10:36:03

The logistics of FumentoGrouting small conduit is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

965HP113924865
2023-09-12 11:23:08

I finally waited until I bought it FumentoGrouting small conduit. At first, I was still wondering whether to buy it. I liked it a little bit. I was a little scared to read the comments. I was afraid that the quality was not good. It was not a genuine product. It was a bit different from the picture. However, everything is wrong, the things are good, authentic, the boss is good, and the logistics are good.

632HP195506591
2023-09-12 10:26:30

The stuff is really good, but FumentoGrouting small conduit the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping guide.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。