Kuotitland izaliParameters of SCB dry type transformerInvestment Analysis
2022-12-06 02:30:26Oil leakage of heat pipe radiatorAfter tightening the loose bolts, seal the flange, and solve the bolts that are likely to leak, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.Kuotitland izali,The efficiency of transformer is closely related to the output power level of transformer. Generally, the greater the output power, the smaller the loss to output power ratio and the higher the efficiency. On the contrary the smaller the output power, the lower the efficiency.Plug in the power with full load first, observe and detect that the input and output voltage meets the regulations. At the same time, ignition, odor and other abnormal conditions. If there is any abnormality, please cut off the input switching power supply.Milabad,Avoid the load operation of power transformer: if the load operation is long-term, it will lead to the scalding of solenoid coil, slow aging of insulation, short circuit fault between boxes, two-color short circuit fault or short circuit to ground fault and dissolution of oil.When the transformer is put into operation, if the tap changer is not in time, a great & ldquo; Tweet & rdquo; The high-voltage fuse is broken when the noise is serious; If the tap changer is defective, it will cause mild & ldquo; Squeak & rdquo; Corona discharge sound, it is likely to burn the circuit breaker of the tap changer. In case of such situation, power off immediately for maintenance.The switching power supply lacks one phase of power;
When the transformer is out of phase, if the second phase is blocked, there is still no sound when the second phase is sent, and there is sound when the third phase is sent; If the third phase is blocked, the sound will not change, as in the case of the second phase. There are three reasons for phase deficiency:The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.After no-load test run is normal for h, it can be transferred to on-load operation,Kuotitland izaliTransformer temperature in high voltage distribution room, and the load shall be gradually increased from %, % and % by grade.installA specific part of dry-type transformer is the hanging core of dry-type transformer. The hanging core of dry-type transformer is a vital component. How to carry out the hanging core?The time difference between different steps of three-phase power switch of switching power supply shall be less than ms, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side) the closing shall be maintained by high-voltage arrester, and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring, and D (or D) is triangular wiring.
The vibration reduction of collecting and townhouse solves the soft connection of collecting and townhouse. For the copper bar of the low-voltage bus of the equipment, the electromagnetic induced noise oscillation may be transmitted from the townhouse to the building structure. The core of noise reduction solution must be changed to copper wire connection.Application process, the resistance value of the grounding wire shall be measured accurately every two years.Noise solution of dry-type transformerKuotitland izali,Kuotitland izaliFully sealed oil immersed transformer,Kuotitland izaliSCB dry type transformer model,For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.Oil leakage of cast iron partsConnection group structure of dry-type transformer