Lida500KVA price of power transformerIncreased market volatility

2023-01-06 09:37:41

Dry type transformerAvoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.Lida,After the power transformer has been used for a long time common faults of iron core will occur. Don't worry. Contact the transformer manufacturer, and the manufacturer will assign professional technicians for inspection. The main reasons are as follows:Some are tied with plastic tape, and some immediately press the two edges together,LidaInstallation drawing of oil immersed transformer, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Aurangabad,In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitSeal oil leakageTherefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition, during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.


Lida500KVA price of power transformerIncreased market volatility



It will also produce many faults, make full use of the performance indicators and advantages of oil immersed transformer, and short-circuit fault is more general.The rate of transformer is: n = P / pxo%, that is, when the copper loss of transformer is equivalent to iron loss, the rate is very large. Therefore the load of transformer is: = P / PK. Fully consider the active power loss caused by reactive power in the system software during transformer operation. The load adjustment is: it can be seen from the calculation of load formula that the large rate of transformer does not occur when the load is full, it is about % Generally, but when selecting the transformer capacity,LidaPartial discharge standard for dry type transformer, we should select effective transformers according to the load condition and load, so as to make the transformer in the situation of economic development and achieve the goal of power saving.Dry type transformer oscillation is solved by applying vibration damping platform to dry-type transformer and carrying out low-frequency vibration reduction management, which can control the oscillation below .%, and then reduce the building structure noise transmitted by dry-type transformer oscillation.Installation conditions,When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.The vibration reduction solution of cable bridge is to modify the hard connection between bus bridge and dry-type transformer, and the vibration reduction solution is made at the cable bridge.High voltage fuse of transformer breaks one phase;


Lida500KVA price of power transformerIncreased market volatility



The tail end of the high-voltage winding head and the middle tap are made of copper inserts and embedded parts, with good strength and stiffness, which is conducive to adjusting the data and has a unique and neat style.For more,LidaPower transformer, please check,In relay protection dry-type transformer, the disconnection of the fault point is related to each other. In a word, if there is any problem at a certain point, it will affect the whole power circuitThe transformer manufacturer will introduce the efficiency of the transformer to youWhen sampling from a small and medium-sized power transformer without a discharge pipe (or oil sample suspension plate), it can be in a power transformer such as a glass test tube when it is not in operation to extract the oil sample at the bottom, or it can be replaced by changing the oil.Lida,The heat discharge pipe of heat pipe radiator is generally made of slotted seamless steel pipe after flattening by stamping die. When the heat discharge pipe is bent and welded by electric welding, oil leakage is often caused. This is due to the supporting force on the surface of the pipe and the working pressure on the inner cavity when stamping the heat discharge pipe.Manufacturing process and steps of dry-type transformerDifferent diversion methods, while oil transformers mostly use porcelain waterproof casing;

404 Not Found

404 Not Found


nginx

Related articles

Lida500KVA price of power transformerWhat are the uses of cutting

Lida500KVA price of power transformerWhat are the uses of cutting

Before application, the sampling container shall be cleaned with vehicle gasoline, soapy water or ot...

评论列表

466HP159575805
2023-01-06 09:53:51

Happy cooperation and tight packaging. Let’s talk about business services: Like

409HP184720764
2023-01-06 11:25:36

Your company Lida500KVA price of power transformer has a very good service attitude, thank you, and like you.

570HP155642700
2023-01-06 11:04:01

After looking for the Lida500KVA price of power transformer from your family for a long time, I mustered up the courage and the quality of the inspection was very good.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。