KronovDry type isolation transformer factoryWhat are the principles of installation
2023-05-01 01:49:56Avoid inadvertent damage of insulation during maintenance: when repairing the hanging core of power transformer, special attention shall be paid to the maintenance of solenoid coil or insulating waterproof sleeve. If there is scratch damage, it shall be handled properly.If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch, then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes,KronovDry type transformer of power plant, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal lift it again until the bell cover exceeds the relative height of the body, and rotate the crane to place the bell cover on the clean skid.Kronov,When the operating oil is mixed with different types of new oil or used for oil, in addition to the accurate measurement of the cold filter point of the mixed oil, it is also necessary to carry out high and low temperature test and sludge test and observe the sludge accumulation. The accumulation cannot be accessed. The results of the operation of the mixing template are not that the original oil is very poor, so it can be managed and used in a mixed manner.The zero line is mainly used in the working circuit. The voltage caused by the zero line is equivalent to the line resistance multiplied by the current of the working circuit. Because of the distance, the voltage caused by the zero line can not be ignored. As a countermeasure to maintain life safety, it is more and more unreliable. Ground wire (PE): it is not used as a working circuit, but only as a maintenance line. Use the affirmation of the earth & ldquo; ” Voltage. When the machine and equipment casing is electrified, the current will be quickly grounded. Even if there is a lead for the PE line, it will be grounded from the surrounding grounding body.Zaltan,Then clamp the branch pipe with your thumb, clearly put forward the glass test tube, rotate and release the oil in the tube to clean the sampling tube carry out it twice, and then draw the oil sample.Noise pollution control and prevention measures of dry-type transformerThe first step of the whole wave process calculation is to calculate the basic parameters of the Internet such as inductance, capacitance and resistor. The accuracy of those basic parameters does great harm to the calculation results of the whole wave process. For the inductance calculation, the good model is the solid model of infinite transformer core column, but there are many calculation methods.
Careless maintenance and insulation damageHand touch method for transformer inspectionAfter tightening the loose bolts, seal the flange, so as to achieve the goal of complete treatment. Tighten the loose bolts strictly according to the actual operation and processing technology.production,The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?
Noise pollution control and prevention measures of dry-type transformerWhere is it, resulting in overheating and melting of the iron core;During no-load test run, the transformer shall be connected with the working voltage from the switching power supply side, and then make the working voltage impulse closing.Kronov,What is the wiring mode of dry-type transformer?The representative mode of connection group of dry-type transformer is: English capital letters indicate the wiring on the primary side (or primary side), and English letters indicate the wiring on the secondary side (or secondary side). Y (or y) is star wiring,KronovManufacturer of 80 KVA dry type transformer,KronovCooling mode of oil immersed transformer, and D (or D) is triangular wiring.In specific daily life, we have a certain understanding of the optical wavelength of oil immersed transformer. What kind of function does it have for transformer?