GreenlandPrecision tubewholesaler
2022-12-26 05:43:32The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.The secondary grouting pipe can only be grouted once and cannot be reused.
According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth and then conduct secondary grouting for the full depth.After the grouting hole is drilled, install and lower the grouting pipe, grout stop plug, mixer and other facilities in the hole.GreenlandPrecision tubewholesaler,GreenlandPrecision tube,2022-12-2605:43:32The secondary grouting pipe can only be grouted once and cannot be reused.The secondary grouting pipe can only be grouted once and cannot be reused.
Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method,GreenlandGrouting pipe, aerated silicification method and electric double liquid silicification method.After the grouting hole is drilled, install and lower the grouting pipe, mixer and other facilities in the hole.Greenland,Catabola,GreenlandSeamless pipe,The grouting mechanism includes filling grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.