BayagunaWhich is the best place to install cold storage equipmentMaintenance requirements

2022-11-22 00:40:58
632HP195506591energy203
you must remove all the influences. It is very important to recognize that when these beautiful refrigerators are built in the villa room

In the process of realizing your dream, the collection pit (pool) for flushing (thawing) and drainage should adopt the Countermeasures of avoiding freezing and cleaning and avoiding backflow of water.Anti odor floor drain shall be set on the pavement of refrigeration room and refrigeration unit room, and the height width ratio of floor drain water seal shall not be less than mm. The elevator shaft, electronic pit and other places convenient for drainage shall be provided with drainage and equipment to avoid backflow of water.Bayaguna,Good heat dissipation, good refrigeration. Do not stack sundries around the refrigeration unit The electrical equipment of the fresh-keeping warehouse equipment shall be protected from moisture and electric shock caused by electric leakage. The hinge, the selection of cold storage is related to the overall operation of cold storage in the future. The selection of high-quality cold storage is conducive to the use and maintenance of cold storage. This requires us to inquire more about the warehouse board for cold storage engineering. Before the construction of cold storage project, we should first realize the temperature requirements of cold storage and the importance of cold storage to cold storage. Because the cold storage project has high environmental requirements such as temperature, attention should be paid to the performance and material of the cold storage board when selecting the cold storage board.Kjoge,The cold storage shall be regularly overhauled and maintained, so as to reduce the failure rate of the refrigeration unit and achieve good refrigeration effect.The construction of small cold storage is widely used in life, such as food industry, manufacturing industry, etc. since cold storage is so widely used, do you know cold storage? Especially the construction process and steps of cold storage. Understanding the construction process and steps of cold storage is helpful for all links of cold storage maintenance.Application of parallel compressor in cold storage: the requirement of refrigeration capacity is large, and to refrigeration compressors under Malige need to be used on weekdays; Long term operation, large load peak valley difference and significant departmental load; Frozen and refrigerated objects are novel foods that are easy to decay and degenerate, and have strict requirements for temperature and humidity.


BayagunaWhich is the best place to install cold storage equipmentMaintenance requirements



Before the acceptance and delivery of the project, the board surface shall be wiped clean. If there is any scratch, it shall be treated. There shall be no obvious scratch on the board surface.Replace the refrigeration oil. After years of service, the refrigeration oil inside the compressor shall be replaced. The oil stain,BayagunaHow much is the charge for installing cold storage, which thickens the refrigeration oil, deteriorates the fluidity and performance, reduces the effect, takes a long time, increases the burden of the compressor, and the current will be higher than that of the new machine, This is a bad phenomenon. Replace the refrigerant oil regularly and timely to maintain the good performance of the system, so as to ensure the long-term use of the equipment.Vent valve or water seal well shall be set at the outlet of flushing (thawing) drainage pipeline. Cold proof measures shall be taken for exhaust valves and water sealed wells in severe cold areas.How much does it cost?,Cold storage plate features: good thermal insulation performance, light weight, high strength, corrosion resistance, anti-aging, beautiful appearance.The importance of regular oil discharge, descaling and air discharge in the refrigeration system of the warehouse.Precautions for purchase and shipment when using the medical cold storage project, the speed must be strictly guaranteed during the purchase and shipment of products. If the temperature of the medical cold storage is about degrees, the opening time must be strictly within minutes. If the temperature of the medical cold storage is left and right degrees, the opening time can not be too high, strictly within minutes.


BayagunaWhich is the best place to install cold storage equipmentMaintenance requirements



Cold storage design step: the selection of cold storage refrigeration system the selection of cold storage refrigeration system is mainly the use of cold storage refrigeration compressor and air conditioning evaporator. Generally, small and medium-sized refrigerators are dominated by fully enclosed refrigeration compressors. Due to the small output power of the fully enclosed refrigeration compressor, the price is relatively cost-effective; Small and medium-sized refrigerators are generally dominated by semi closed refrigeration compressors; Semi closed refrigeration compressor is adopted for large and medium-sized refrigerated warehouses. When adopting, ammonia refrigeration unit can also be considered. Because the output power of ammonia refrigeration unit is large and can be used for machine use, but the installation and management of refrigerated warehouses are cumbersome. When using the air-conditioning evaporator the high-temperature cold storage uses the industrial cold fan as the air-conditioning evaporator. Its characteristic is that the temperature reduction speed is faster, but it is easy to lead to the water consumption of the cold collection; Medium and ultra-low temperature refrigerators are dominated by seamless evaporation pipe slots, which is characterized by very good temperature control effect and moderate cold storage.Inspection items,Watertight polyurethane rigid foam has low water absorption, good permeability to water vapor, and state of foam pores. It is not connected with each other, and the obturator rate is more than %. It is a dense microporous foam material, which is more dense than the surface of the air, and is not easy to permeate. It is an hydrophobic material.The air-conditioned storage is relatively fast. It usually reaches the required temperature, a few minutes faster and an hour slower. Of course, according to the temperature of the environment, the amount of inventory and the temperature in winter and summer, refrigeration is also divided into air cooling, water cooling, direct cooling and simple cooling. Different refrigeration is fast and slow, but most small refrigerators are air-cooled, the refrigerant flow is too large too large or too small refrigerant flow: improper adjustment or blockage of throttle valve will directly affect the refrigerant flow into evaporator. When the throttle valve is opened too large, the evaporation pressure and evaporation temperature also increase, and the decline rate of warehouse temperature will slow down; At the same time, when the throttle valve is opened too small or blocked, the refrigerant flow will also decrease, the refrigeration capacity of the system will also decrease and the decline rate of warehouse temperature will also slow down.Bayaguna,The cooking materials and foods refrigerated in the quick-frozen warehouse contain a certain amount of fat, protein and starch. The existence of these nutrients will make molds and bacteria multiply and grow in large numbers. In order to do a good job in the hygienic management of cold areas and ensure the refrigeration quality of food and cooking raw materials, it is necessary to carry out the hygienic disinfection of cold areas regularly.There are many application scenarios of cold storage, which are different. For a long time, it provides various cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage,BayagunaWannian cold storage installation, medical cold storage, on-site settlement, honest operation, and has offices all over the country for long-term cooperation. Different purposes, functions and designs, so what needs to be understood in cold storage design?When opening and drilling is required for the top warehouse plate or wall plate, the internal and external setting out and positioning shall be carried out according to the drawing design requirements, and the opening and drilling shall be carried out after review; The inlet hole, liquid inlet hole, water supply hole and drainage hole shall be opened with a hole opener. Construction treatment shall be carried out in time after opening and drilling, and the orifice shall be closed with foaming material or sealant to prevent air leakage and cold running; The door, vent and delivery port shall be decorated with wrapped edges and fixed with pull rivets with a spacing of mm and mm outside.

404 Not Found

404 Not Found


nginx

Related articles

CambridgeInstallation of fruit and vegetable fresh-keeping warehouseHow to realize mass consumption

CambridgeInstallation of fruit and vegetable fresh-keeping warehouseHow to realize mass consumption

What should be considered in building a cold storage? In these aspects, food cold storage is a syste...

EvertonCold storage engineering installationHelp businesses resume operations

EvertonCold storage engineering installationHelp businesses resume operations

The installation of top warehouse plate should be carried out alternately with the installation of w...

AlajuelaSeed preservation cold storageWhat concerns

AlajuelaSeed preservation cold storageWhat concerns

There are many application scenarios of cold storage, which are different. For a long time, it provi...

EscuintraInstallation of large cold storageWhat is special

EscuintraInstallation of large cold storageWhat is special

During the installation of long-span top warehouse plate, if the supporting steel beam has been inst...

MoreliaWhere is the design and installation of cold storage goodAdvantages of industry development

MoreliaWhere is the design and installation of cold storage goodAdvantages of industry development

MoreliaConstruction organization design of cold storage installation,Anti odor floor drain shall be...

AlbaniaConstant temperature medical cold storageCarry out skills training in high-risk industries

AlbaniaConstant temperature medical cold storageCarry out skills training in high-risk industries

Judge the operating sound of the compressor and carefully listen to the operating sound of water pum...

评论列表

35HP162657470
2022-11-22 09:14:30

The logistics is very fast, look forward to working together again

409HP184720764
2022-11-22 08:06:27

Dear, BayagunaWhich is the best place to install cold storage equipment I received it, I love it very much, the workmanship is nothing to say, haha, the service attitude is also super good, a very caring seller, I will frequent it in the future.

984HP143755493
2022-11-22 09:25:27

BayagunaWhich is the best place to install cold storage equipmentHow much is it and how can I sell it?

122HP117294921
2022-11-22 09:23:48

When BayagunaWhich is the best place to install cold storage equipment offer discount points for activities, contact me when there are discounts

256HP158312377
2022-11-22 08:30:47

So give praise! Just received the goods, very good, BayagunaWhich is the best place to install cold storage equipment great value for money! ! Come in the future!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。