CamaguiPrecautions for medical cold storageReasonably guide local investment
2022-08-27 00:36:25Various construction materials, such as material certificate, test report and stage acceptance record, shall be carried out simultaneously with the project construction, carefully, timely accurately and comprehensively reflect the whole process of production and construction, and actively cooperate with the owner in design change and technical negotiation.The installation of cold storage board is a link of the cold storage installation project. High price cold storage installation of various specifications, cold storage installation, cold storage construction, fruit preservation cold storage, medical cold storage. Waste merchants, industry, enterprises and power departments are welcome to visit and negotiate! The cold storage body and storage plate include: floor, vertical plate and ceiling plate. The installation of storage plates in different directions and precautions are as follows: enter the construction site, verify the construction situation according to the construction drawings, determine the equipment installation position, and then refer to the following specifications.Camagui,After the welding of the whole system the air tightness test shall be carried out, conduct leak detection with soapy water and the high-pressure end shall be filled with mp nitrogen. Nitrogen charging MP at low pressure end. During pressurization, and carefully inspect all welded junctions, flanges and valves, so as to keep the pressure from falling off after the completion of simplicity.In the low temperature environment, especially in the periodic freezing and thawing cycle, the building structure is also vulnerable to. Therefore, the building materials of the cold storage and the structure of each part of the cold storage should have sufficient frost resistance.Chiquimula,CamaguiInstallation of fresh-keeping cold storage for vegetables and fruits, - Installation of the vertical plate of the cold storage: select the angle first according to the site conditions and locate it (i.e. lock the vertical plate and the floor) to extend to both sides at this angle. Only lock the vertical plate and the vertical plate, and locate it when it meets the vertical angle. Put the beautiful plate in a conspicuous place. When installing it on the side of the evaporator, make the drainage pipe in advance,CamaguiCold storage manufacturer, and make U-bend and silica gel outside the storage.Cold storage is mainly used for frozen processing and storage of foodFor the flushing (thawing) drainage pipe in the cold room with different temperature, an exhaust valve equipment shall be set before connecting the flushing (thawing) drainage pipe.
The use of large-scale cold storage is naturally very strict in installation and material selection. Therefore, in the face of the above possible situations, we can strictly screen the insulation board materials of cold storage, which can effectively alleviate or solve the above problems. However, at present, there are many fields using cold storage insulation board, so the details of the use environment should be considered for the wood making of many such products in the market.The knowledge of cold storage repair and maintenance is something you can't fail to understand in the process of daily use of cold water!Features of quick freezing warehouse: the quick freezing technology is advanced, the frost free quick freezing method is adopted, the famous brand compressor and refrigeration accessories are configured, and the automatic frost is adopted. The method can only be used by microcomputer. The refrigeration system adopts green refrigerant,When the cold storage is used for the first time or shut down for a long time, it is strictly prohibited to stack goods in the warehouse. The warehouse must be slowly reduced to the required temperature. For the low-temperature warehouse, it needs to be cooled in stages to avoid sudden changes in the temperature difference inside and outside the warehouse, resulting in the warehouse body.The polyurethane insulation board shall be connected by plug-in notch connection, because it has higher strength when connecting in this way.The type of cold storage to be built in the type of cold storage should be determined according to the type of circulating goods. For example, the cold storage that only circulates vegetables can only build a fresh-keeping cold storage, while the cold storage with refrigeration + freezing will be built if there are many types of circulating goods and great difference in storage temperature. As for the size of the cold storage, it should be determined according to the type, quantity, frequency, whether to use shelf stacking and so on. For example, for fruits and vegetables packed in cartons, the storage capacity of -kg per cubic meter can be referred to and the size of cold storage construction can be estimated in combination with the storage capacity rate of about .-..
The construction of cold storage in site selection bears the circulation of low-temperature goods. Therefore, the transportation convenience of cold storage construction site should be given priority in site selection, such as proximity to roads, railways, etc. At the same time, the location of the cold storage should avoid large pollution sources and direct sunlight,Immediate cooling is to install the condenser of the cold storage in the box or building of the cooling equipment, use the volatilization of the refrigerant to immediately cool the air in the air,CamaguiCold storage installation design, and use the cold air to cool the objects that need to be cooled. This kind of refrigeration is characterized by faster cooling speed, small heat conduction temperature difference and simple system software, so it is widely used.Evaporation temperature the sweating temperature of the refrigeration in the wafer machine needs to be lower than the air temperature in order to transfer heat from the engine room to the refrigerant. Usually, the temperature difference of room air conditioner is between C and C. If the temperature difference cannot be maintained due to adverse factors, the operation energy consumption will increase.The door of the combined cold storage is not tightly closed. Please adjust the distance between the hinge on the door and the door lock and the storage body.Camagui, - floor installation of cold storage: first level the floor, then install the floor, select a beautiful floor and put it in a conspicuous place, and do a good job in the floor and evaporator drainage system.Fault phenomenon: high current or tripping during unit startup, and problems of user air switch; Input voltage is too low; The star angle conversion interval is too short (it should be ~ seconds); Hydraulic cylinder failure (no reset); Intake valve failure (too large opening or stuck); Loose wiring; Host failure; Main motor fault; TR time relay is broken (relay unit).During the installation of polystyrene storehouse, the Perpendicularity Error of wall plate shall be corrected while the top storehouse plate is installed. The length of the top warehouse plate shall be mm shorter than the surface of the wall plate. After the installation of the top warehouse plate