KingstonMain transformer of power plantWhat to pay attention to during operation

2023-02-08 22:11:09

The conductor insulation of power transformer is the main part of internal insulation. Some conductors should pass through the middle of electromagnetic coil, or between electromagnetic coil, iron yoke clamp and automobile oil tank wall. Therefore, it is necessary to ensure that this kind of conductor has sufficient insulation compressive strength, i.e. insulation spacing.Performance and main parameters of common metal composites, various welding processes and machinery and equipment, preparation treatment of thick steel plate, blanking process, production and manufacturing process and quality standards of automobile oil tank, riser, coupling and oil storage tank cabinet, welding leakage test and NDT technology, surface treatment process and quality standards, copper, Production process and quality standard of aluminum shield; Body suit iron insertion process, wire installation process, body dryness solution and dry transformer oil solution process, vacuum pump oil immersion, general installation process, leakage test and leakage detection process and quality standards. Performance parameters of key work clothes, machinery and equipment of each process flow; The natural working environment is basically regulated.Kingston,According to statistics, to occupy the main global technical position,KingstonAmorphous alloy transformer and oil immersed transformer, the transformer industry depends on two key data, commodity volume and voltage level. As early as & ldquo; Eleventh Five Year Plan; In the early stage, manufacturing and application of dry-type transformers all over the world, but it is not a big country.There are also many problems to pay attention to in the preventive measures and process of dry-type transformer damping. What are the key effects and functions of dry-type transformer damping and the corresponding preventive measures? Let's master and consult in detail with the small editor of the dry-type transformer manufacturer.Myitkyina,Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform, is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.It includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, the closing shall be maintained by high-voltage arrester, and the neutral line of transformer shall be reliably grounded (it shall be grounded immediately).


KingstonMain transformer of power plantWhat to pay attention to during operation



The electromagnetic coil is wound with copper power wire or foil and lifted with glass fiber. The epoxy adhesive does not need filling. The vacuum drying equipment is used for degassing and dehumidification. The overall concrete is poured with high fracture toughness, resistance to short-circuit faults, common faults and impact. The work is diligent.The selection shall be carried out according to the load characteristics of power. There are many types of power loads. Different dry-type transformers shall be used for different power loads. If the standard impulse level of power load is less than kV, class H dry-type transformers shall be used. If the standard impulse level of power load exceeds kV, epoxy resin adhesive shall be used to pour dry-type transformers.Gradually, high-frequency vibration damping mechanical equipment, such as low-frequency vibration damping platform is installed at the bottom of the dry-type transformer, which can reduce the downward dispersion of the vibration of the dry-type transformer. Then replace the connection between the dry-type transformer and the surrounding engineering buildings, roads, etc. with flexible connection, or use elastic yellow shock absorption mechanical equipment to prevent the vibration from spreading according to the rigid connection. If possible, the dry-type transformer room can also be soundproofed and decorated, and sound-absorbing plates and silencing shutters can be used to improve the soundproofing capacity of the dry-type transformer room.Application process,A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Power transformer factoryManufacturing process and steps of dry-type transformer


KingstonMain transformer of power plantWhat to pay attention to during operation



The voltage regulating tap changer is not in place or poorhow much,The switching power supply lacks one phase of power;Under normal conditions, different oil-based oils cannot be mixed. Under special circumstances, if it is necessary to use new oil of different grades, it should be determined whether the mixed oil with ice degree can be used according to the requirements of the region, and then the oil mixing test should be carried out.The project cost is different. Compared with the purchase price of capacity transformer, the purchase price of dry-type transformer is much higher than that of oil immersed transformer.Kingston,Under normal conditions, the operation and maintenance management staff shall improve the safety inspection range of the transformer, and immediately communicate and contact with the on-site project staff in case of any problems, so as to ensure the reliable and stable operation of machinery and equipment.The flange surface is uneven the tightening bolts are loose,KingstonMining dry-type power transformer,KingstonTransformer price of 1000 KVA, so that the bolts are not tightened well and the installation and processing process is wrong, resulting in oil leakage.When the new oil filled by the power transformer and the oil sample that has just been considered are used, the oil sample can be used only after sufficient standing.

404 Not Found

404 Not Found


nginx

Related articles

MassaHydraulic lifting platform truckFast delivery

MassaHydraulic lifting platform truckFast delivery

Regularly check the operation of each mechanism for normal operation and noise. If any faults are fo...

TapachuraDrilling fluid slurry pumpHow to select the model

TapachuraDrilling fluid slurry pumpHow to select the model

  Moreover, because the length of the long shaft is generally fixed, it is often troublesome to inst...

Gdansk ancient citySmall new energy three wheel elevatorReduce capital occupation

Gdansk ancient citySmall new energy three wheel elevatorReduce capital occupation

The fixed lifting platform has a very obvious advantage over other types of work platforms, which is...

BecksPrice of guide rail type lifting platformHow to save

BecksPrice of guide rail type lifting platformHow to save

Check the protective cable condition of the cable guide frameThere are many operational errors, and...

GaobeidianFixed hydraulic lifting platformShow space of strength

GaobeidianFixed hydraulic lifting platformShow space of strength

The products of the lifting platform can meet very strict safety standards, and during the operation...

TenellenRoutine test of oil immersed transformerIntroduction to the preparation work that needs to be done before homework

TenellenRoutine test of oil immersed transformerIntroduction to the preparation work that needs to be done before homework

cooled by natural air and large capacity by centrifugal fan. Oil immersed transformers are insulate...

评论列表

409HP184720764
2023-02-08 23:42:21

I'm busy, I forgot, I'm sorry, what else can I say~~ This KingstonMain transformer of power plant is really good, lucky enough.

984HP143755493
2023-02-08 23:27:47

Very good buyer. Thank you. My colleagues like it very much KingstonMain transformer of power plant. Come again next time

717HP127443542
2023-02-08 23:19:51

Although KingstonMain transformer of power plant has not yet arrived, I am looking forward to it, and the inquiry is still in transit.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。