GuatemalaHow much is a 50 KVA box transformerDigital transformation boosts high-quality development

2022-08-17 19:35:30
which is stacked at the degree fully inclined multi-step interface. The surface is covered with epoxy resin adhesive cable sheath coating, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Tabulator,The input and output three-phase power lines shall be connected to phase a phase B and phase C respectively according to the color of yellow, green and red bus duct of transformer terminal board. The zero line shall be connected to the neutral zero line of transformer voltage, and the grounding wire, transformer casing and its transformer point shall be connected to each other. At ordinary times, the ground wire and zero wire are led out by the neutral wire of the transformer. (for example, the transformer box shall be matched with the ground wire mark of the shell and connected with each other). Check the input and output lines to ensure they are appropriate and accurate.When leaving the factory, the production and processing are not smooth and the sealing is poor. The common fault of oil leakage will be caused after the oil transformer is sealed for a period of time.Naturally, if the oil immersed transformer catches fire please don't panic. I firmly believe that the damage will be reduced to a lower level as long as the above methods are effectively rectified. Above is the general process and process that should be paid special attention to in the whole ignition process of the oil immersed transformer. When the oil immersed transformer catches fire, please be rational to make the oil immersed transformer safer and more efficient.


GuatemalaHow much is a 50 KVA box transformerDigital transformation boosts high-quality development



(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.For oil transformer oil replenishment, unused transformer oil conforming to the new standard should be selected first. In addition,GuatemalaInsulation grade of oil immersed transformer, the oil with the same basic, same brand and same additive type is expected to have a stronger effect. The characteristics of the oil should not be lower than that of the oil in mechanical equipment. When the new remaining oil is less than %, there is generally no problem. However, if there is more new remaining oil, oil shall be added before oil type Chromatographic analysis and pressure test shall be carried out to establish that there is no oil stain, and the acid value and dielectric loss shall not exceed the oil in the machinery and equipment.The plastic shells of electrical products and office supplies are equipped with grounding wires. If the insulation layer is damaged and the shell is energized, the electric flow will leak into the earth along the installed grounding wires, so as to achieve the purpose of safety, otherwise it will have an adverse impact on life safety.Development Curriculum,When using the oil sample of the power transformer in operation, it is necessary to add some oil from the oil gate valve at the lower part of the oil tank or the sampling gate valve to release about kg of waste liquid stored at the bottom to clean the oil inlet, and then take the oil sample.The sampling container is a colorless glass bottle with a wide mouth ground glass plug with a volume of .kg or kg. - bottles shall be collected at a time for analysis and experiment. Labels shall be attached during sampling. Pay attention to the name, source, sampling date sampling person, weather conditions and other materials of the oil sample.Wiring mode of dry-type transformer:


GuatemalaHow much is a 50 KVA box transformerDigital transformation boosts high-quality development



When checking the hook core, the insulation of the electromagnetic coil and the porcelain sleeve is usually accidentally damaged. After the shell of the pottery is broken, if you work again, turn on the photo flash when it's light,GuatemalaOutline dimensions of 2500kVA dry type transformer, and it's short when it's heavy. Therefore, please pay attention during maintenance. It is not necessary to destroy the insulation. After maintenance, experts can inspect special tools,GuatemalaPower transformer specification, parts, insulation, etc. and deliver them after they are determined to be complete and reliable.Excellent service,The manufacturing process of dry-type transformer is very process, and must be technically as a certain pillar. Only in that way, the performance of dry-type transformer will be more stable. What are the common manufacturing processes and steps of dry-type transformer?The grounding resistance of, high voltage and bottom voltage shall not be less than % (m & omega;) of the original value. The difference between the three-phase mean value of winding resistance measurement at the same temperature shall not exceed %, which shall not exceed % compared with the last accurate measurement result.Oil leakage of cast iron partsGuatemala,Oil leakage of cast iron partsCommon problems of tap changer of power transformerThe voltage regulating tap changer is not in place or poor

404 Not Found

404 Not Found


nginx

Related articles

Lv LiangMobile aluminum alloy lifting platformDetailed introduction of common problems and solutions

Lv LiangMobile aluminum alloy lifting platformDetailed introduction of common problems and solutions

With the continuous development of the economy, meeting the needs of society, and increasing product...

La Rochelle Many electric hydraulic elevatorsfair prices

La Rochelle Many electric hydraulic elevatorsfair prices

Overloading or long-term eccentric loading operations are strictly prohibited, as this not only redu...

Cohen NippsHydraulic fixed lifting platformIs the market restricted by the industry

Cohen NippsHydraulic fixed lifting platformIs the market restricted by the industry

Cohen NippsMany electric hydraulic elevators,Equipped with an overload hydraulic safety protection s...

ArmstrongFour meter electric elevatorComparative advantage

ArmstrongFour meter electric elevatorComparative advantage

the door may not meet the above requirementsSetting requirements: The landing door should be standa...

AkoyapaHow to select power transformerYield strength

AkoyapaHow to select power transformerYield strength

In fact, ground wire is not only a kind of grounding protection. The following describes in detail t...

hamburgerElectric three wheel hydraulic lifting platformStrict control of product quality

hamburgerElectric three wheel hydraulic lifting platformStrict control of product quality

Pay attention to checking whether there are broken wires and pine stocks in each ministry. If the re...

评论列表

466HP159575805
2022-08-17 21:19:31

Your service is very good, GuatemalaHow much is a 50 KVA box transformer is also very cheap! I will come often in the future!

409HP184720764
2022-08-17 20:58:21

Happy cooperation and tight packaging. Let’s talk about business services: Like

263HP145816628
2022-08-17 21:29:45

Let me evaluate this GuatemalaHow much is a 50 KVA box transformer, the price is good, the quality is good, the delivery is good, and the boss is good.

717HP127443542
2022-08-17 20:51:09

The delivery speed is very fast, give your company a thumbs up

632HP195506591
2022-08-17 19:58:12

After receiving the goods, I feel that the quality GuatemalaHow much is a 50 KVA box transformer is still relatively good, consistent with the seller’s description, very satisfied, the delivery speed is relatively fast, the logistics company’s service attitude is very good, and the delivery speed is very fast. In general, this This is a very satisfying purchase, thank you to the seller.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。