Big goatTunnel combined hollow anchor manufacturerWhat are the performance points

2024-03-11 00:07:17
965HP113924865Building materials48

The use of grouting pipes has become indispensable in modern building construction, because China&#;s ancient buildings are very technical in construction. In China, before and in the early s, grouting pipes made of bamboo and wood were used in the construction of buildings. After the mounting bracket is welded on the surface of the grouting pipe, push the strain gauge in a stable and free state without bending and twisting; The mounting bracket and strain gauge shall be installed parallel to the support axis; When tightening the screw, pay attention to reasonably controlling the frequency of the strain gauge; The installation position of the strain gauge shall be selected at the position suitable for protection as far as possible.The foundation pit excavation shall strictly follow the principle of 'layered excavation'. The support erection shall be closely coordinated with the earthwork excavation. During the excavation, the earthwork near the grouting pipe shall be excavated by the central trenching method to prevent the machinery from colliding with the support; The earthwork near the slope protection pile shall be excavated manually with small machines and tools. It is forbidden to collide with the grouting pipe and bored pile by mechanical excavation. After the earthwork is excavated to the design elevation, the grouting pipe shall be erected and prestressed in time to reduce the exposure time without support.Big goat,Consolidation Prevent landslide Reduce ground subsidence Improve foundation bearing capacity Backfill Reinforcement materials: cement slurry, chemical slurry, mixed slurry object: rock grouting, gravel grouting, clay grouting, coal body grouting coal and rock mass grouting : anti-seepage grouting, reinforcement grouting,Big goatGrouting seamless pipe, foundation underpinning grouting, water blocking reinforcement grouting, sealing filling grouting mechanism: filling grouting, splitting and vein grouting,Big goatLeading small conduit manufacturer, bedrock crack grouting seepage grouting Interface grouting, concrete crack grouting, compaction grouting pressure: static pressure grouting, high-pressure jet grouting ceramic technology; It is divided into high-pressure grouting and ordinary grouting injection grouting.Grouting pipe grouting mainly improves the bearing capacity of piles from these two aspects Grouting is carried out through the grouting pipe embedded in the pile body. The slurry integrates the soil and slurry around the pile body through penetration, splitting and compaction, so as to improve the physical and mechanical properties of the bearing layer of the pile body Especially for the ballast at the bottom of the pile, grouting can improve or eliminate the adverse effect of the ballast at the bottom of the pile on the end bearing capacity through the replacement, compaction and consolidation of the ballast by the slurry.II During the drilling process of the bored pile, there will be a certain gap between the pile retaining wall and the surrounding soil layer, which will lead to the decrease of the pile side friction and affect the bearing capacity of the pile When the grouting pipe is used at the pile end for grouting, the slurry will permeate, fill and compact along the side of the pile under the pressure, so as to complete the replacement of the mud skin around the pile and the filling of the gap, such as greatly improving the pile side friction resistanceMonrovia, Sometimes the grouting pipe is overlaid on the two sides of the horseshoe surface. Adjust the cooperation specifications of the grouting pipe at the distribution nozzle. How to avoid grout leakage during installation of grouting pipe?In recent years, there have been frequent natural disasters such as mountain slides, floods, earthquakes fires, the subgrade will not be greatly damaged due to natural disasters, so that we can save more people in the rescue work. The grouting pipe can also play a great role in slope protection. The use of the grouting pipe can well prevent the landslide of mountain soil and debris flow disasters. Through many years of practical experience, it has been proved that the roads that usually use the grouting pipe are far more than the same period of projects in terms of service life and quality. Thus reducing the casualty rate. Grouting pipe is a kind of excellent geosynthetics used for Pavement Reinforcement, old road reinforcement, subgrade reinforcement and soft soil foundation reinforcement. It has become an irreplaceable material in the application of asphalt pavement reflection crack treatment. This product is a semi-rigid product made of high-strength alkali free grouting pipe, which is made of mesh base material through internationally advanced warp knitting process and surface coating treatment. It has high tensile strength and low elongation in both longitude and latitude, and has excellent properties such as high temperature resistance, low cold resistance, aging resistance and corrosion resistance. It is widely used in asphalt pavement, cement pavement and subgrade reinforcement, railway subgrade, embankment slope protection, airport runway, sand prevention and control projects. Grouting pipe laying and fixing of grouting pipe laying of glass fiber grouting pipe can be carried out by special equipment refitted from tractors or automobiles, or manually.In China, the types of grouting pipes are relatively complete now, from grouting pipes and grouting pipes for Reinforcing Subgrade to glass fiber grouting pipes for highway pavement, to convex joint grouting pipes and plastic tensile grouting pipes for railway. For different road construction environments, different types of grouting pipes are selected, which can not only ensure the quality of the road but also save the cost. So what kind of application effect can the grouting pipe achieve in highway maintenance? The grouting pipe manufacturer will take you to have a look.


Big goatTunnel combined hollow anchor manufacturerWhat are the performance points



The mesh structure of the grouting pipe can make the pore water pressure dissipate faster, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the grouting port must be replaced, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, when the prestressed tendon is long and the grouting pipe must be repeatedly tensioned and fixed, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe, but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel, and the other is as a pipe for grouting at the bottom of the pile. Cut and cut the spring skeleton grouting pipe according to the components. The cutting surface must be flat and free of burrs. The length of its flat section must be ≥ the connecting reinforcement measures. During the bending process of the grouting pipe, it is not allowed to use a small one. The inner diameter of the grouting pipe is compressed and cracked. The alignment between M and FL is -At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, and limit the lateral displacement of soil in the whole plane of the grouting pipe. The grouting pipe plays an important role in the key points of settlement. Therefore, it is reasonable to use the grouting pipe to treat the uneven settlement of fill excavation transition subgrade. This paper yzes the action mechanism of the grouting pipe according to its type and characteristics, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.High quality and low price,A short section of screw end rod is welded on both ends of a single prestressed thick steel bar, and the nut and backing plate are sleeved to form the simplest grouting pipe. The pretension force is transmitted to the nut through the bearing force on the threaded slope of the screw end rod, and then to the concrete components around the reserved hole crossing through the base plate.Let&#;s take a look at the prestressed machines and tools. The small editor of prestressed machines and tools reminds everyone that the screw end rod is made of cold drawn or heat-treated reinforcement, and the thread is fine teeth. The welding between the end rod and the prestressed reinforcement should be carried out before the cold drawing of the prestressed reinforcement. This grouting pipe can be used at the tensioning end and the fixed end. A general jack is used for tensioning, and the jack pull rod (with internal thread at the end) is tightened on the thread of the screw end rod for tensioning. After tensioning, tighten the nut and anchor the rebar. The advantages of this grouting pipe are relatively simple, and when the jack returns oil after the grouting pipe, the prestressed reinforcement basically does not slide. If necessary, facilitate re tensioning. The disadvantage is that the accuracy of the length of prestressed reinforcement is high, and it cannot be too long or too short, otherwise the thread length is not enough.How heavy is a grouting pipe?When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?


Big goatTunnel combined hollow anchor manufacturerWhat are the performance points



The small editor of prestressed machines and tools will lead you to understand the main connection methods between the drive device and the wellhead: the connection between the flange of the drive head of the electric oil pump and the parallel flange is the most widely used one at present. There is a flange at the lower part of the drive head, After the two pipes are connected by using the deformation of the grouting pipe, the kneading part of the joint is large at both ends and small in the center, so that the joint is stuck at one time, avoiding the possibility of loose union. The grouting pipe has proper, stable and excellent s in terms of tensile pull-out and torque resistance, and the protrusion is circular arc with small protrusion, which is useful to avoid collision with conduits, vibrators, etc.It is a kind of embedded grouting pipe system, cold joints,Big goat22hollow composite anchor manufacturer, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water penetrates into the joint it can be sealed by injecting slurry into the PVC port set on the surface. The proper grouting time can be selected after the concrete curing. Leakage joints can also be permanently sealed in this way. Injecting grout into the embedded grouting pipe can seal construction joints, cold joints, pipe leakage and joints between the ground walls.When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?Big goat, the grouting pipe can also be used as the pipe for the defect washing and grouting treatment of the accident pile. At this time, it is necessary to take measures to punch the pipe at the defect position where grouting is required. The classification of the grouting pipe can be divided into three categories according to the pipe materials: the advantages of steel pipe steel pipe are that it is easy to install, and it can be welded on the reinforcement frame by electric welding, which can replace part of the reinforcement section, the parallelism and straightness can be basically maintained. At present, many large-diameter cast-in-place piles use steel as the grouting pipe. However, the price of steel pipe is relatively expensive: steel corrugated pipe steel corrugated pipe is a better grouting pipe material. It has the characteristics of thin pipe wall, less steel, impermeability, pressure resistance, high strength and good flexibility. It is usually used for post tensioning reserved holes in prestressed structures: when used as grouting pipe. It can be directly bound to the reinforcement framework soil, and the joint can be connected with a larger corrugated sleeve. Since the bellows is light, it is very convenient to operate, but attention should be paid to keeping its axis straight during installation.In the process of using the acoustic pipe, it is necessary to have a detailed understanding of its installation method, so that it can be used normally and improve the application quality of the grouting pipe. In the process of installing Jiangsu acoustic measuring tube, we should pay attention to the orientation of the installation hole. As long as the device is installed in a correct hole, the Jiangsu acoustic tube can be used normally in the process of application, and the service life of Jiangsu acoustic tube can be improved. This is also the most important factor in the process of application in the future. If the hole fault is bragged about in the process of the device the resistance of Jiangsu acoustic pipe will appear in the process of application, resulting in its damage. There is a great relationship between the accuracy of the hole and the quality after construction. In the process of construction, it is necessary to use the device according to the planned paper so that it can be used normally and improve the quality of use.In the process of application, because there will be many Jiangsu acoustic measurement pipes in the process of construction. In this way, the phenomenon of uneven stress will be formed. In the process of application, the phenomena of conflict and unusable will be formed. In order to prevent the phenomenon of surrounding each other it is necessary to pay attention to the method of the device in the process of the device, so that it can be used normally. The grouting pipe manufacturer introduced that the product quality of the grouting pipe is relatively stable, and when the mold is finalized it is not easy to show defects. Most of the defects of the grouting pipe appeared in the trial production period, and most of them were formed due to the unreasonable planning structure of the mold. The grouting pipe manufacturer will briefly introduce the treatment methods of defects as follows: wrinkle appearance and treatment methods. The so-called wrinkle refers to that there is a convex edge on the circular arc surface of the grouting pipe, some of which are straight to the nozzle and often occur symmetrically at both ends of the center line, in the shape of 'eight'. Chengdu grouting pipe manufacturers mostly occur on the inner arc surface, and some occur on the outer arc surface.The important reason for the stability of the grouting pipe reinforced soil subgrade is to further verify the main principle of the grouting pipe reinforced soil subgrade treatment technology. It is to place various types of grouting pipe products inside, on the surface of the soil mass or between the layers of soil mass. Relying on the tensile characteristics of the grouting pipe, the distribution of the internal stress field and displacement field of the reinforced soil mass is changed through the friction and embedment between the grouting pipe and the surrounding soil mass.


404 Not Found

404 Not Found


nginx

Related articles

Gisborne304 stainless steel pipe price 1 kgThe golden period of brand building

Gisborne304 stainless steel pipe price 1 kgThe golden period of brand building

Carbon structure delivery status: delivered in the status of heat treatment (annealing, tempering af...

Varos Stainless steel coiled plateMatters needing attention in handling and application

Varos Stainless steel coiled plateMatters needing attention in handling and application

In the first ten days of May, the overall order intake of medium and heavy plate mills in Tianjin He...

Denver304 stainless steel pipe ton priceHow to make the rolling process

Denver304 stainless steel pipe ton priceHow to make the rolling process

Specification of hot-dip galvanized steel mesh protective fence: short pitch (SWM): the length of sh...

Old harbourWholesale of welded pipeGrasp the market

Old harbourWholesale of welded pipeGrasp the market

Heating surface pipes, economizers, superheaters, reheaters, pipes for petrochemical industry, etc....

Volcan304 stainless steel pipe welding methodBoost innovation

Volcan304 stainless steel pipe welding methodBoost innovation

VolcanSpecific gravity of stainless steel pipe, such as thousandth of CrNi (i.e. .% C)Stainless ste...

BerlinStainless steel medical tubeWidely used in recent years

BerlinStainless steel medical tubeWidely used in recent years

Argon shall conform to the rules of national specifications, and argon with purity of % shall be sel...

评论列表

881HP198728332
2024-03-11 08:17:05

Big goatTunnel combined hollow anchor manufacturerVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

935HP175192871
2024-03-11 08:18:34

The stuff is really good, but Big goatTunnel combined hollow anchor manufacturer the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping guide.

779HP136589660
2024-03-11 08:07:20

You Big goatTunnel combined hollow anchor manufacturer are okay, give a discount next time you buy, and buy your company's Big goatTunnel combined hollow anchor manufacturer

535HP136858825
2024-03-11 07:56:45

Good seller, thank you. My colleagues like Big goatTunnel combined hollow anchor manufacturer very much. Come again next time!

466HP159575805
2024-03-11 07:27:05

Big goatTunnel combined hollow anchor manufacturer Give me a discount next time, I wish you a lot of money

632HP195506591
2024-03-11 09:06:05

A good seller, even a novice, a lot of Big goatTunnel combined hollow anchor manufacturer don’t understand. Fortunately, the seller has patient guidance on the other end of the computer, and I have a sense of accomplishment, and finally figured out the problem that I didn’t understand.^- ^Learn more in the future!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。