FlourishingSeamless pipeThe spring of the factory is still far away, and the pain of the industry may have just begun

2022-04-20 07:38:02
263HP145816628Electronic Component632

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method double liquid silicification method, aerated silicification method and electric double liquid silicification method.The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.

FlourishingSeamless pipeThe spring of the factory is still far away, and the pain of the industry may have just begun


Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.According to the sequence of sectional construction along the stratum depth, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes, steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.FlourishingSeamless pipeThe spring of the factory is still far away, and the pain of the industry may have just begun,2022-04-2007:40:19Special slings shall be used for the lifting of horizontal members such as laminated plates, and the stress at each lifting point shall be uniform to avoid fracture due to uneven stress of members. Grouting method is to put some solidified slurry into the cracks or pores of rock foundation in order to improve its physical and mechanical properties. Professional grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory,FlourishingSeamless pipe,FlourishingPrecision tube, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint,FlourishingSteel pipe, pipe leakage and the joint between the ground wall.

FlourishingSeamless pipeThe spring of the factory is still far away, and the pain of the industry may have just begun


The secondary grouting pipe can only be grouted once and cannot be reused.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Flourishing,The secondary grouting pipe can only be grouted once and cannot be reused.

404 Not Found

404 Not Found


nginx

Related articles

HonoluluSeamless pipeRecent quotation manufacturers

HonoluluSeamless pipeRecent quotation manufacturers

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue...

StocktonSteel pipePrices fell first and then rose this week, and then fluctuated in a narrow range

StocktonSteel pipePrices fell first and then rose this week, and then fluctuated in a narrow range

It is used to seal the construction joints, pipe seepage joints and gaps between ground walls in con...

San Juan DiosPrecision tubeRecently, the price is brewing to rise, and it will be bullish in the later stage

San Juan DiosPrecision tubeRecently, the price is brewing to rise, and it will be bullish in the later stage

San Juan DiosSteel pipe,Repetitive grouting pipe can be reused for many times. Long term grouting st...

Dense ringGrouting pipeIntroduction of relevant advantages of using push rolling perforation

Dense ringGrouting pipeIntroduction of relevant advantages of using push rolling perforation

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue...

JoyabaySteel pipeThe market is depressed and the price is hard to guess

JoyabaySteel pipeThe market is depressed and the price is hard to guess

The secondary grouting pipe can only be grouted once and cannot be reused.● specification: inner dia...

Santiago de MariaSeamless pipe1 domestic interpretation of the off-season trend

Santiago de MariaSeamless pipe1 domestic interpretation of the off-season trend

It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground...

评论列表

984HP143755493
2022-04-20 09:17:11

The logistics is very fast, look forward to working together again

263HP145816628
2022-04-20 08:34:13

FlourishingSeamless pipe It’s really good, how long does it take to arrive after the departure?

709HP180518493
2022-04-20 09:34:36

Do you have FlourishingSeamless pipe here? FlourishingSeamless pipeWhat is the spot price

256HP158312377
2022-04-20 09:09:12

Brother, with your support, this new model FlourishingSeamless pipe is indeed up to standard and very good.

632HP195506591
2022-04-20 09:28:41

Yes, FlourishingSeamless pipe good quality and great value for money

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。