La hachoInstallation price of cold storageWork of economic operation regulation
2024-03-05 02:34:15During the production of cold storage,La hachoCold storage company, the cold storage will produce fixed length, width and thickness according to the needs of various cold storage projects. Generally, cm thick cold storage plates are selected for high and medium temperature cold storage. The requirements for cold storage engineering plates of low-temperature storage and quick-frozen storage will be higher. Professional cold storage installation, installation, construction, fruit fresh-keeping cold storage and medical cold storage ensure the quality, use cm or cm thick library board. When you budget the cold storage project, you can make a reservation according to the specific conditions of your cold storage temperature. If you don't make a reservation for the cold storage plate, you should pay attention to the density of the cold storage plate and the thickness of the steel plate when purchasing the cold storage plate. According to regulations, the foaming density of cold storage is per cubic meterDuring the production of cold storage, the cold storage will produce fixed length, width and thickness according to the needs of various cold storage projects. Generally, cm thick cold storage plates are selected for high and medium temperature cold storage. The requirements for cold storage engineering plates of low-temperature storage and quick-frozen storage will be higher. Professional cold storage installation, installation, construction, fruit fresh-keeping cold storage and medical cold storage ensure the quality, Guarantee service. Guarantee quality. Your satisfaction is our pursuit! Welcome to inquire. In this case, use cm or cm thick library board. When you budget the cold storage project you can make a reservation according to the specific conditions of your cold storage temperature. If you don't make a reservation for the cold storage plate,La hachoDesign of small cold storage, you should pay attention to the density of the cold storage plate and the thickness of the steel plate when purchasing the cold storage plate. According to regulations, the foaming density of cold storage is per cubic meterLa hacho,Does the cable wire meet the parameters? In general, the cold storage needs to use phase electricity.Energy saving and power saving: the design cost of quick freezing warehouse mentioned above is very low, but it has a great impact on the cost of quick freezing warehouse and later use cost. The electricity bill is often an important expenditure item in the later stage. The design scheme of the show can greatly reduce the power consumption of the quick freezing warehouse. The selection of the back sunny side of the quick freezing warehouse, the selection of the thickness of the thermal insulation board should be appropriate, the tightness of the quick freezing warehouse door, and the temperature difference between the adjacent cold storage rooms should not be too large are all issues that we need to consider. There are also some tips,It is strictly prohibited to place articles with pollution and peculiar smell around the cold storage. The surrounding environment of the cold storage must be cleaned and disinfected regularly every day, and the door of the cold storage must be locked.The exhaust temperature of the compressor equipment is often. When the season changes and the temperature difference changes greatly, pay attention to it. If the machine is abnormal, it needs to be checked in time.Cold storage has good fire and flame resistance. After adding flame retardant, polyurethane is a kind of flame retardant and self extinguishing material. If it is burned by fire, it can be carbonized, unlike flow burning and flashover like extruded board, which can effectively prevent fire spread. In particular, it can be closed as a whole after fire prevention treatment to form non combustible products.
Other aspects: in the design process of food cold storage, it is also necessary to consider the cooperation between the cold storage and on-site fire fighting, ventilation, water and electricity systems. It should meet the requirements of safety, science and environmental protection. When designing and installing the cold storage, the drainage problem must be considered, and the following points should be paid attention to during redesign and installation.If the refrigerator has been used for more than months or the high / low voltage switch often fails, or the refrigeration capacity is reduced, please arrange staff to clean the condenser. If the ultra-thin light box is repaired according to the above instructions for many times, and the refrigerator fault still sounds for a long time please ask the maintenance personnel of the refrigerator to repair it.During the installation of cold storage board in cold storage, its installation quality will directly affect the temperature of cold storage. As an important structure used in the cold storage, the cold storage board should pay attention to the details of its installation, find out the problems that are easy to be ignored, and avoid the wrong installation, which will affect the use of the cold storage or the whole installation process, so as to waste resources and increase the cost.Marketing Department,General quick-frozen warehouses are mostly cooled by refrigeration mechanism with low gasification temperature (ammonia or Freon)Connect the refrigeration system. Wires and copper pipes shall be used to connect the refrigeration unit, electric control system and other components of the cold storage. The connecting pipes shall be closely connected, and corresponding thermal insulation and protection measures shall be taken.Floor insulation of medium-sized cold storage the structure of medium-sized cold storage is what we often call the surface, that is, the common operations in the market are: laying the ground with XPS extruded board while the ground needs to be insulated separately. At present, laying moisture-proof and steam isolating SPS materials above and below the extruded board respectively, how to seal the refrigeration equipment is the key. First of all, all through wall pipelines must be equipped with sleeves, the frost flushing water return pipeline must be equipped with U-shaped bend water seal, and the main frost flushing and return pipeline outside the warehouse shall be equipped with air filling port to prevent the gas in the warehouse from being pumped out of the warehouse by negative pressure. In addition, due to the good sealing of the quick freezing warehouse, the set fluctuation range of the warehouse temperature should not be too large to prevent excessive positive and negative pressure from damaging the warehouse body.Honesty is the foundation,Frequently observe the operation state of the heart compressor of the cold storage equipment and its exhaust temperature. During the season change operation, pay special attention to the operation state of the system and adjust the liquid supply and condensation temperature of the system in time.If necessary, install a filter on the compressor return pipeline to prevent dirt in the system from entering the compressor and remove water in the system.Immediate cooling is to install the condenser of the cold storage in the box or building of the cooling equipment, use the volatilization of the refrigerant to immediately cool the air in the air, and use the cold air to cool the objects that need to be cooled. This kind of refrigeration is characterized by faster cooling speed,La hachoDrug freezer, small heat conduction temperature difference and simple system software, so it is widely used.La hacho,. Maintenance of food cold storage. In a position convenient for operation outside the door of the refrigerator room a main switch for cutting off the power supply of the refrigeration compressor shall be set. This switch shall be able to stop the operation of the refrigeration compressor, and relevant signs shall be set. If the mechanical panel is set in the main room, a button switch shall be added next to each refrigeration compressor.Preparation, prepare the project planning of cold storage, and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site, check the material quality and model, and start the installation of cold storage after confirmation.It is equipped with temperature compensation to automatically adjust the water temperature. The water temperature of ultrasonic atomization is - degrees. If our humidifier is connected with the warehouse, even in the work, the water temperature is low