Granada22kv power transformerProduct Range

2023-01-01 02:10:12

Wiring mode of dry-type transformer:The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words,Step up process of dry-type transformer?Power transformers are used in all walks of lifeFrachaThe long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.Deterioration damage of transformer core insulationPower transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.


Granada22kv power transformerProduct Range



Power transformer is one of the key equipment in power station and substation. The function of power transformer is in all aspects. It can not only raise the voltage and send electromagnetic energy to the power consumption area, but also reduce the voltage to each application voltage, so as to meet the needs of power consumption. In short voltage transformation and blood pressure reduction must be carried out by the transformer.It can be seen from the above that from the perspective of power saving, in some cases, transformers & ldquo; A small horse pulls a small car & rdquo; Can't compare with & ldquo; Middle car & rdquo;, little dragons & rdquo;, Therefore, the loss of transformer full load and load must be considered in the calculation, and the results can be properly made in terms of power saving or power consumption. According to the correlation between the load rate and the transformer capacity: . The transformer load rate and power saving will be brought into the formula: the load index of the transformer, that is, the operating load and rated capacity of the transformer . Now it is illustrated by examples that both sides of the acadc al electron touch toe ground type seek the derivative of P, and then reduce the active power loss of the large capacity transformer from the active power loss of the small capacity transformer: that is, the formula is reduced The load index is the load index when the transformer operation loss is small and the rate is large, and the rate is large when the specific copper loss is equivalent to iron loss.If the volume of power transformer is too small, the transformer will be overloaded for a long time and it is easy to destroy machinery and equipment. Therefore, the rated capacity of the transformer should be selected according to the power consumption, which is not suitable for too large or too small.Promise and keep promise,Noise pollution control and prevention measures of dry-type transformerBefore application, the sampling container shall be cleaned with vehicle gasoline, soapy water or other organic solvents (such as trisodium phosphate) except oil stains, and then washed with tap water until it is not alkaline,GranadaPower supply transformer S11, and then cleaned with purified water for many times. The cleaned sampling container shall be dried in a ℃ drying oven. After refrigeration, the bottle cap shall be tightly closed and cannot be opened before application.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, resulting in the ignition of power transformer. Therefore, the insulation compressive strength of power transformer shall be tested before installation and operation, and overload is not allowed in the whole process of operation.


Granada22kv power transformerProduct Range



Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Executive standard,Granada500 kV oil immersed transformer,Causes of fire in power transformerTransformer manufacturers generally adopt IP protective casing, which can avoid the entry of solid dirt with a diameter of more than mm, rats, snakes, cats birds and other animals, resulting in vicious common faults such as short-circuit fault and power failure, and provide a safe natural barrier for the energized part. If the transformer equipment must be outdoors, IP protective casing can be adopted, which can avoid being equally divided with the above IP protective effects However,GranadaHigh voltage bushing of oil immersed transformer, IP casing will reduce the refrigeration capacity of the transformer, so pay attention to the reduction of its operating volume.If the power transformer stops running for more than h (if the allowable time should be reduced when the ambient humidity is & amp; gt; %), it should be insulated before putting into use, and accurately measured with a V grounding megger. The insulation resistance from the primary side to the secondary side and the ground should be ^ mfl, the insulation resistance from the secondary side to the ground should be ^ mh, and the insulation resistance from the iron core to the ground should be & amp; gt; mfl (note that the grounding device piece should be removed).Granada,High voltage fuse of transformer breaks one phase;Oil leakage of cast iron partsAfter hours of continuous trial operation with a certain load, the main body and accessories of the transformer are all normal, and the transformer will turn to all normal operation.

404 Not Found

404 Not Found


nginx

Related articles

PedrigalCarbon steel explosion-proof pipeline pumpIndustry trends

PedrigalCarbon steel explosion-proof pipeline pumpIndustry trends

   There is also a vibration method to measure the vibration frequency of the pump, and the measurem...

HanshanRear flip hydraulic plate flipperAnswer the magnetic question of standard parts

HanshanRear flip hydraulic plate flipperAnswer the magnetic question of standard parts

limited data can only be obtained from outside the shaft to determine whether it is non-standard (i...

zhen'an Elevating platform truck 30 metersBecome the industry's new normal

zhen'an Elevating platform truck 30 metersBecome the industry's new normal

so the staff need to master its operation knowledge when operating. This is the basic content. At t...

HuanghuaScissor type lifting platform truckcost price

HuanghuaScissor type lifting platform truckcost price

So when a star holds a concert, the lifting stage can highlight the atmosphere of the concert, and i...

MazetourJiangsu hydraulic lifting platformCorresponding strategies for domestic industry adversity

MazetourJiangsu hydraulic lifting platformCorresponding strategies for domestic industry adversity

What are the configuration requirements for the upcoming elevator; Generally speaking, the higher th...

DeltaReactor and transformerVisualization technology

DeltaReactor and transformerVisualization technology

Loose core screwOn load commissioning:DeltaMany people probably don't know much about the power dist...

评论列表

35HP162657470
2023-01-01 10:05:05

Granada22kv power transformer Give me a discount next time, I wish you a lot of money

717HP127443542
2023-01-01 10:18:32

Buying things online is about integrity, and you do it! Thank you Granada22kv power transformer Like one Fast delivery, very good attitude, very satisfied! very good!

709HP180518493
2023-01-01 09:35:49

The seller is really good, Granada22kv power transformer is the same as the introduction, honest seller

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。