Saint gislandPrecision tubeEnvironmental protection policy appears again and prices are bullish
2024-04-16 02:37:33● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)Repetitive grouting pipe can be reused for many times. Long term grouting steel flower pipe, steel flower pipe grouting, pile foundation grouting pipe, grouting pipe manufacturer, old brand, price advantage and quality! Each time it is used up,Saint gislandGrouting pipe, the pipe core and the outer wall of the pipe shall be washed clean.
A -m long orifice pipe is installed at the opening of the grouting hole to prevent possible hole collapse. At the same time, it plays a guiding role in drilling. During grouting, it is used to install orifice closure device to prevent slurry leakage.According to the measured water absorption of the borehole, verify the water permeability of the rock stratum, and provide professional quality assurance for grouting pipe, steel flower pipe,Saint gislandPrecision tube, high-pressure grouting pipe, pipe shed pipe and grouting pipe factory. During the preferential activities, new and old customers are welcome to consult to determine the grouting pressure and flow, and determine the grouting slurry and its initial concentration.Saint gislandPrecision tubeEnvironmental protection policy appears again and prices are bullish2024-04-1602:37:14● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter tolerance: & plusmn; .mm; Length of each roll: m.
The secondary grouting pipe can only be grouted once and cannot be reused.The grouting equipment, grouting pump and the lowered grouting pipe are connected for grouting,Saint gislandSeamless pipe, and the grouting is carried out according to the requirements. The grouting pump will inject the slurry into the soil. After completing the construction of one grouting section move the grouting pipe up or down according to the requirements to carry out the construction of the next grouting section.Saint gisland,Huancavelica,The grouting mechanism includes filling grouting, compaction grouting and splitting grouting. Grouting materials include granular slurry and chemical slurry. Granular slurry is mainly cement slurry, and chemical slurry includes silicate (water glass) and high slurry. Silicification method, alkali solution method, high chemical grouting method and cement grouting method.