VilanovaSteel pipePrice stabilization is a top priority for the survival of enterprises
2023-04-27 01:01:07Special slings shall be used for the lifting of horizontal members such as laminated plates, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price,VilanovaSteel pipe, service, stop leakage, strengthen and correct the deflection of buildings.Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.
According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section, continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth, and then carry out re grouting from bottom to top; The sectional upward pattern is that the grouting hole is drilled to the final grouting depth at one time. All kinds of grouting pipes steel flower pipes, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.VilanovaSteel pipePrice stabilization is a top priority for the survival of enterprises,2023-04-2701:01:06Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, aerated silicification method and electric double liquid silicification method.The secondary grouting pipe can only be grouted once and cannot be reused.
● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)Water pressure test water pressure test is that the grouting pump injects clean water into the grouting section,VilanovaGrouting pipe,VilanovaPrecision tube, and its main purpose is to check the slurry stop effect of the slurry stop pipe head, especially the slurry stop plug.Vilanova,Cologne● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)