San Severo Huangshi boarding bridgeDirect selling price

2024-01-12 00:16:18

What are the issues to pay attention to when using the boarding bridge? For example, mobile boarding bridges are generally used outdoors, and after use, they are also placed outdoors. They are often exposed to wind, rain, and sunlight, which reduces the lifespan of the boarding bridge. Therefore, the maintenance of the boarding bridge is very important. When it rains, cover the boarding bridge with a rain cloth to prevent rusting and aging.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power check the circuit and eliminate the fault; If there is electricity,Check the hydraulic oil quality and level. When the lifting platform is raised to a high position eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.San Severo , the oil becomes sticky, or there are foreign objects such as gravel in the oil, the hydraulic oil should be replaced in a timely manner. The hydraulic system of the lifting platform should be checked for hydraulic and pipeline connections. If the pipeline is damaged, it should be replaced immediately; When there is looseness in the connection part, tighten the pipe joint.When the hydraulic oil is insufficient, the hydraulic pump will produce suction phenomenon, causing air to enter the hydraulic oil and also producing high noise. The boarding bridge is already a very visible structural form in modern logistics sites. It is the point and endpoint of the enterprise logistics chain, and a loading and unloading operation platform for enterprises to quickly and safely turnover products and goods. The height of the loading and unloading operation platform is fixed, but there is always a certain height difference or gap between the transportation vehicles and the loading and unloading platform due to the height of the carriage. Causing the forklift to be unable to enter and exit the transportation vehicle for direct loading and unloading of goods. Use the boarding bridge to provide reliable connections. Enable forklift trucks to safely and quickly enter and exit transportation vehicles for loading and unloading operations.Delancey,San Severo Hydraulic mobile boarding bridge,There are three movable boards on both sides of the air conditioning board, which can effectively prevent the adjustment board from falling down and keep the pressure foot in a safe state.Nowadays, the electric hydraulic boarding bridge has become a loading and unloading tool used by many companies. Compared to many friends, I am still not very familiar with electric hydraulic boarding bridges. Below, the editor will explain the product parameters and specifications related to the length,San Severo Boarding Bridge Price, slope, and height of the electric hydraulic boarding bridge.During the excavation process of the foundation pit of the simple boarding bridge, collision of the support structure should be prevented, and changes in the soil wall should be paid attention to at all times. If any abnormal phenomena such as cracks are found, construction must be suspended and reported to the superior for handling.


San Severo Huangshi boarding bridgeDirect selling price



The precautions during the use of hydraulic boarding bridges are hoped to be helpful to you.Check the rollers, intermediate shafts, and bearings; Oil cylinder pin and bearing; Equality and wear of the hinge shaft and bearings of the boom; Add oil to the above components for maintenance of outdoor elevators and factory elevators. Extend the service life of bearings. Professional axle manufacturers and other special products, old brands,The hydraulic boarding bridge not only reduces labor intensity, but also doubles the efficiency of loading and unloading operations, accelerates logistics speed, and achieves significant economic benefits. Hydraulic loading and unloading bridge is a specialized auxiliary equipment for fast loading and unloading of goods. Its height adjustment function allows a bridge to be built between the truck and the cargo platform in the warehouse. Forklifts and other transport vehicles can directly enter the truck for batch loading and unloading of goods, also known as loading and unloading platforms.  . Before use, check the boarding bridge for obvious damage such as cracks and broken wires.Reasons for the hydraulic boarding bridge lifting platform not lifting: low voltage, motor not rotating, motor reverse, motor phase loss (motor not moving and buzzing), indicator light on, press the up button, motor rotates but lifting platform does not rise, lowering valve is open, overflow valve pressure is low, oil level is too low, oil pump is empty, oil suction filter is blocked, oil suction section is leaking, and two phases in the three-phase line are arbitrarily changed; Solution: Check the starter potential during motor load operation. Voltage hydraulic range allowed± 10%; Check the motor and circuit; Check the circuit breaker and motor wiring; When the lowering button is released, use a voltmeter to check whether the lowering valve is energized. If there is no power, check the circuit and eliminate the fault; If there is electricity, eliminate the malfunction of the lowering valve itself. The slide valve of the lowering valve must be kept clean and move flexibly. Readjust the overflow valve. Adjust at % rated load; Fill up the hydraulic oil; Clean the filter; Check the oil suction pipe and joints; Tighten the joint and replace it if necessary.


San Severo Huangshi boarding bridgeDirect selling price



Shake the handle to raise the boarding bridge to the height of the container.assets,To ensure that the hydraulic boarding bridge is in good condition, it should be checked in advance before use mainly including whether the buttons are effective; Whether the power cord and socket are intact; Whether the oil pipeline is intact; The stability of the guardrail; The tightness of bolts at each junction point; The appearance quality is intact. But when the power is turned on and the indicator light is on, press the up button, the motor rotates but the lifting table does not rise. This may be due to the reverse connection of the three-phase power supply and the motor reversing. Only the power supply needs to be corrected so it is not a major problem.There are many types of boarding bridges, and their respective roles and application fields are also different. Hydraulic boarding bridges, fixed boarding bridges, and mobile boarding bridges are currently common and advantageous equipment on the market, we will first analyze the development trend of mobile boarding bridges: mobile hydraulic boarding bridges are a good helper for loading and unloading goods on forklifts. Compared to pneumatic tires, mobile boarding bridges are equipped with solid tires with low starting resistance,San Severo Hydraulic fixed boarding axle, simple structure, convenient use and maintenance, no need for inflation no hidden dangers of air leakage and tire explosion. And solid tires have good safety, durability, puncture resistance, tear resistance, and take corresponding drainage measures for the top, surface, and foot of the slope, especially for the simple boarding bridge.San Severo ,Shake the handle to raise the boarding bridge to the height of the container.These are the options for hydraulic oil for mobile boarding bridges.Slowly reverse and park the container under the lip at the front of the boarding bridge.


404 Not Found

404 Not Found


nginx

Related articles

San Severo Huangshi boarding bridgeCommodity market has a greater impact

San Severo Huangshi boarding bridgeCommodity market has a greater impact

After the boarding bridge work is completed, all parts should be scrubbed and cleaned. When not work...

评论列表

258HP138990173
2024-01-12 07:32:04

The level of the seller MM is very high, and the people are very patient. I saw a lot of San Severo Huangshi boarding bridge, but I feel that you have the strength and bought yours. I didn’t expect it to be like this. Sellers like this are already online Rarely. I have asked a lot of sellers, but they can't do it, seller MM has done it. And the price is low. I am really happy.

47HP158935852
2024-01-12 08:05:00

San Severo Huangshi boarding bridge The quality is very good, the transfer has been received, the boss is troubled, thank you very much!

60HP184127502
2024-01-12 08:23:46

San Severo Huangshi boarding bridge It can be said to be top-notch, and the details are perfect.

779HP136589660
2024-01-12 08:50:09

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this San Severo Huangshi boarding bridge. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。