DetroitGrouting pipeThe domestic price index rose in the past week

2022-03-01 00:46:03
263HP145816628Electronic Component459

The secondary grouting pipe can only be grouted once and cannot be reused.Special slings shall be used for the lifting of horizontal members such as laminated plates, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, high price, service, on-site settlement and honest management! The purpose of grouting is to prevent seepage, stop leakage, strengthen and correct the deflection of buildings.

DetroitGrouting pipeThe domestic price index rose in the past week


According to the sequence of sectional construction along the stratum depth, grouting can be divided into sectional downward, sectional upward and sub full depth grouting. The segmented downward type is to start from the ground, drill section holes from top to bottom and inject section slurry. After each injection section continue to extend the drilling and grouting, so as to alternately carry out until the designed final grouting depth,DetroitPrecision tube, steel flower pipes,DetroitSteel pipe, advance small conduits, high-pressure grouting pipes, pipe shed pipes and the formal qualification of grouting pipe factory are welcome to inquire by telephone and sincerely invite cooperation! Grout stop shall be used for bottom-up sectional grouting; The secondary full depth grouting method is to drill the grouting hole to the final grouting depth, and then conduct secondary grouting for the full depth.Push the rock powder and sundries that are not washed, remain at the hole bottom, or stick to the hole wall out of the grouting range, so as to improve the bonding strength and impermeability between the slurry stone body and the fracture surface.DetroitGrouting pipeThe domestic price index rose in the past week,2022-03-0100:47:45It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint,DetroitSeamless pipe, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe, advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, old brand, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, pipe leakage and the joint between the ground wall.It is used to seal the construction joints, cold joints, pipe seepage joints and gaps between ground walls in concrete. It is very suitable to install grouting pipes between the joints of new and old concrete. When water seeps into the joint, the PVC port slurry on the surface can be set to seal the joint. The appropriate grouting time can be selected at the end of concrete curing. Leakage joints can also be sealed with this. Provide long-term grouting pipe, steel flower pipe advance small pipe, high-pressure grouting pipe, pipe shed pipe, grouting pipe factory, price advantage and quality guarantee! In the embedded grouting pipe, the slurry can seal the construction joint, cold joint pipe leakage and the joint between the ground wall.

DetroitGrouting pipeThe domestic price index rose in the past week


Process flow: drill in place → Drilling → Mud injection → Run casing → Continue drilling → Slag removal → Hole cleaning → Hoist the reinforcement cage → Water jetting and bottom cleaning → Concrete conduit → Placing concrete → Catheter & rarr; The pile top reinforcement can be divided into single liquid silicification method, double liquid silicification method, aerated silicification method and electric double liquid silicification method.The grout stop plug grouting method is generally used for Rock Fissure Grouting. The grouting pipe is provided with a grout stop plug, which can close the upper part of the grouting section. The main construction steps are as follows: the grouting hole is drilled by a rotary drill. All grouting holes in the rock stratum are required to be drilled by coring in order to find out the and distribution of rock stratum fractures. The coring rate shall reach ~ % in the rock stratum and % in the broken rock stratum. The drilling cleaning fluid is mainly clean water. If the rock is broken and the hole collapse is serious, thin mud slurry can also be used as circulating fluid.Detroit,Bayarta-port,● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it grouting pipe, ccll-y full section grouting pipe) and repetitive grouting pipe (ccll-d grouting pipe, ccll-d full section grouting pipe)

404 Not Found

404 Not Found


nginx

Related articles

LesbridgePrecision tubeEnvironmental protection is coming, and our prices are rising steadily

LesbridgePrecision tubeEnvironmental protection is coming, and our prices are rising steadily

● features: the grouting pipe is divided into secondary grouting pipe (ccll-y grouting pipe, qdm-it...

GlendaleGrouting pipeThe price rise is hot, and the environmental protection policy is good for the professional market

GlendaleGrouting pipeThe price rise is hot, and the environmental protection policy is good for the professional market

● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter t...

Willie BrookePrecision tubeInventory transferred to the decline channel

Willie BrookePrecision tubeInventory transferred to the decline channel

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue...

Niagara FallsPrecision tubeWhat's the price

Niagara FallsPrecision tubeWhat's the price

The grouting mechanism includes filling grouting, infiltration grouting, compaction grouting and spl...

RossoSeamless pipeThe price is stable, and the inventory of large households is about 2000 tons

RossoSeamless pipeThe price is stable, and the inventory of large households is about 2000 tons

Process flow: drill in place → Drilling → Mud injection → Run casing → Continue...

KzaletepecSteel pipeInvestment policy overweight is not laughing at this

KzaletepecSteel pipeInvestment policy overweight is not laughing at this

● specification: inner diameter of secondary grouting pipe: mm; Outer diameter: mm; Inner diameter t...

评论列表

984HP143755493
2022-03-01 08:49:15

DetroitGrouting pipe It was posted very quickly, really timely, please give me a thumbs up

570HP155642700
2022-03-01 08:15:59

The quality is very good, really good, DetroitGrouting pipe the same as the picture, the packaging and quality are also very good,

263HP145816628
2022-03-01 09:18:55

DetroitGrouting pipe The delivery is fast and the quality is good, but the logistics is a bit slow. Overall it is good, continue to support!

122HP117294921
2022-03-01 08:45:36

DetroitGrouting pipe Very good, good quality and low price, express delivery is also fast, and inspection is also very standard.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。