Li ShiBielefeldHow to troubleshoot common faults?
2023-08-13 00:35:06When applying a normal force of N to any position on either side of the door using a rigid mm square or circular flat surface in the locked position of the landing door, the door should be able to withstand and have no deformation; - Deformation not exceeding mm; After the test, it worked normally.Many theaters use a lifting platform as a vertical transportation tool for goods. The rear of the main stage or the end of the side stage in many theaters are equipped with a set container transportation lifting platform,Li ShiCatherine Hardwicke , which is used to vertically transport items from the ground to a designated location or even the stage plane. The lifting platform of the music pool is often used for transporting movable seats, rail type and scissor type (curved arm type) to distinguish between overload or equipment malfunction. Fixed types include: scissor lift cargo elevator, and installationMechanical devices controlled by cage movement should not be used to open or close the landing door.Murska Sobota,Monthly maintenance and inspection of hydraulic lifting platform rollers, intermediate shafts and bearings, oil cylinder pin shafts and bearings, boom hinge shafts and bearings for wear. Add some oil to each part to extend the service life of the lifting platform bearings. The quality and level of hydraulic oil. The lifting platform should be raised throughout the entire process, and at this position, the hydraulic ground should be - millimeters higher than the bottom of the box. If the hydraulic oil becomes dark, sticky, or has foreign objects such as gravel, it should be replaced in a timely manner ( # hydraulic oil). Annual maintenance and inspection of all hydraulic pipelines and joints of the lifting platform. The pipeline must not be damaged, and the joints must not be loose. All joints must be tightened. Remove and disassemble the lowering valve of the lifting platform blow out the plunger with compressed air, then install it and reinstall it. Drain and discard the hydraulic oil, tighten the joint remove the oil filter, clean it with compressed air, and then return it to the oil tank and connect the pipeline.The motor of the hydraulic guide rail lifting platform is set around the wellbore, occupying a relatively small area, improving the utilization rate of the wellbore area.Safety performance: Electric elevators not only have the safety device of traditional traction elevators, but also have an overflow valve to prevent excessive system pressure during upward movement
The setting of the cable guide frame should comply with the user manual and regulatory requirements.Construction electric elevators should be equipped with emergency stop switches and comply with regulatory requirements.During the use period, the user unit should organize professional technical personnel to inspect the construction electric elevator monthly according to the standard requirements, and record the inspection results.High quality brand,Especially suitable for steel structured factories, suitable for both indoor and outdoor installation.Protective measures should comply with regulatory requirements.When the distance between the outer edge of the construction electric elevator and the edge line of the external overhead power line cannot meet the requirements in the table above, effective protective measures should be taken.
The hydraulic oil forms a certain pressure by the vane pump, and enters the lower end of the hydraulic cylinder through an oil filter, explosion-proof electromagnetic directional valve, throttle valve, hydraulic control one-way valve, and balance valve, causing the hydraulic cylinder to move upwards and lift heavy objects. The return oil at the upper end of the hydraulic cylinder returns to the oil tank through the explosion-proof electromagnetic directional valve and its rated pressure overflow valve is adjusted. The pressure gauge observes the reading value on the pressure gauge. The downward movement of the hydraulic cylinder (i.e. lowering of heavy objects).Quality documents,Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.The counterweight steel wire rope should be equipped with an anti loosening device that is sensitive and reliable.During loading and unloading, the horizontal distance between the edge of the cage door and the edge of the landing station should not exceed mm.Li Shi,High lifting height, using side mounted oil cylinders, stable operation, noise free, easy maintenance, and longer service life.Before operating the construction electric elevator, routine inspections should be carried out according to regulations and inspection records should be filled out.Small safe operation distance: Circuit voltage (kV) of external power lines<~~~ Small safe operation distance (m) Setting requirements: A small safe distance should be maintained between the outer edge of the construction electric elevator and the edge of the external overhead power line.