2024-04-01 01:03:35Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.Cleaning and cleaning of elevator car guide shoes. As is well known, the guide shoe runs on the guide rail, and there is an oil cup on the guide shoe. To ensure that the elevator does not make any noise during operation, it is necessary to regularly refuel the oil cup and clean the guide shoe,Rome LidoAluminum alloy mast type lifting platform, and the cabin should be cleaned thoroughly.Rome Lido,The elevator stops on the first floor and the door does not move: the fire emergency landing function of the elevator is triggered by smoke or thermal sensors inside the building.The door closing button has no self maintenance function. During the designated maintenance period, refueled, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Matera,The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.The safety monitoring machine room environment screen cabinet main power switch traction wheel speed limiter shaft and pit guide rail layer door and car counterweight should be reliably fixed with pressure plates to prevent loosening.
Measure the beam edge distance between the upper and lower support beams. The measurement is to suspend the line from the upper support point to the ground for positioning, screw elevators, and hydraulic elevators have different requirements for civil engineering. Common traction elevators require a certain amount of hoistway space which can be made of concrete, and glass curtain walls to create sightseeing elevators; The depth of the pit should be at least cm or more; Additionally steel structure hoistways, there are certain requirements for the height of the top floor.Measure the length, width, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.demand,For escalators that require intermediate support, it is necessary to determine whether the site has the conditions for adding support, as well as the range of support that can be added, the height and load size of the equipment and support platform, and other parameters.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station and automatically open the elevator door if it is in the upward direction.The effective support width of the upper and lower support beams should be greater than the width of the escalator truss, and there should be embedded steel plates.
Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator,Rome LidoAluminum alloy lifting platform, greatly shortening its service life and preventing normal use of the elevator.Encyclopedic knowledge,Measurement of elevator shafts in new construction projects under different on-site conditions: When the building design is not yet completed, the operator only needs to provide the user with the standard elevator layout of the required elevator specifications, and the user entrusts the design department to design the elevator shaft. When the architectural design has been completed, and the site has not yet been constructed, is under construction, or has been completed, it must be determined based on the current construction or measured dimensions. If the original civil design of the shaft needs to be modified, the user should entrust the architectural design department to make the shaft design modification based on the layout provided by the elevator.The gantry elevator is used in the door legs of large gantry cranes to transport workers and maintenance components inside the gantry craneThe compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.Rome Lido,b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room,Rome LidoMobile reclaimer, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed, and on the other hand, if any problems occur, someone is also responsible.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.