2023-04-26 01:10:06Feasibility of the design scheme: the design of the quick-frozen warehouse can not be taken for granted. Many restrictive factors should be considered. In practice, a reasonable design scheme should be given according to local conditions. For example, the large-scale quick-frozen warehouse I built for my family should be refrigerated with ammonia in theory, because the refrigeration capacity of ammonia refrigeration is large, and I found that it is cheap to replicate cold through actual field investigation.The valve shall be installed as close as possible to the cooling fan. The solenoid valve shall be installed horizontally, the valve body shall be vertical, and pay attention to the liquid outlet direction.Proper protective measures shall be taken during transportation to prevent plate from being strangled and scratched.Market trend,Indirect cooling is that the air in the warehouse is pumped into the air cooling device by the blower. The air is absorbed by the evaporation pipe circling in the cooling device, and then sent to the warehouse for cooling. The advantages of air cooling are rapid cooling, uniform temperature in the warehouse, and can bring harmful gases such as carbon oxide out of the warehouse during storage.Initial stage of cold storage equipmentTechnical assurance measures for the installation of cold storage: during production in the production workshop, the production shall be carried out in strict accordance with the operation rules specified in ISO quality operation, self inspection and inspection application shall be carried out to ensure that the factory pass rate is,San JoseHow much is the drug cold storage installation, and unqualified products are not allowed to leave the factory.
Install the library body. Generally, the warehouse body can be divided into small warehouse body and large warehouse body. The small warehouse body is basically a combined cold storage assembled with warehouse plate. The large warehouse body is mostly a civil cold storage. The assembled or constructed warehouse body is generally required to be flat, compact and solid, without hollow feeling, load-bearing, antifreeze, moisture-proof, etc.Executive standard,However, long-term continuous operation will inevitably lead to equipment aging, so reasonable maintenance is particularly important.The knowledge of cold storage repair and maintenance is something you can't fail to understand in the process of daily use of cold water!Cold storage is fireproof, flame retardant and high resistance. Professional cold storage installation, cold storage installation, fruit preservation cold storage, medical cold storage and other special products, old brands, price advantages and guaranteed quality. Polyurethane is a flame retardant self extinguishing material after adding flame retardant. Its softening point can be above degrees Celsius and will only be decomposed at higher temperatures. In addition, the ash formed on the surface of polyurethane will be in its foam, and this ash will help isolate the foam below. It can effectively prevent the spread of fire. Moreover, polyurethane will not produce harmful gas at high temperature.San Jose,The medical cold storage has been widely used in the industry. For the use of the medical cold storage project, we must combine the performance of the product and store it according to the temperature and humidity required by the product. The automatic temperature box also needs to be used outside the product cold storage. At the same time, the management personnel must be familiar with the operation steps of the medical cold storage project.The combined cold storage does not cool or the cooling effect is poor. Check whether the condenser of the refrigerator is dirty. Whether frost is too thick on the evaporator in the warehouse. Check whether the refrigerant is leaking (apply soapy water to the pipeline connection, and if bubbles are generated, it indicates that the refrigerant is leaking). And ask the combined cold storage engineering personnel to supplement the refrigerant and deal with the leakage. Check whether the sealing of the combined cold storage door is intact and eliminate it. Whether the refrigerator of the combined cold storage works. Whether the parameter setting of the computer controller of the cold storage is correct, and reassemble the cold storage door for installation. Check whether the cooler in the cold storage fails and replace it. Whether there is enough clearance for stacking articles in the warehouse and dredge them.The refrigerator compressor unit generally adopts high-end units with guaranteed quality and strong operation stability. The evaporator adopts the imported joint venture refrigeration air-cooled evaporator, which can effectively meet the refrigeration capacity of the refrigerator and ensure the refrigeration effect of the refrigerator. The refrigerator lamp adopts the special LED energy-saving lamp for the refrigerator,San JoseCold storage installation and construction company, which has the advantages of low temperature resistance, low energy consumption and long service time, It can effectively save the operation cost of cold storage.