BokoPower transformer designTo inject fresh blood

2023-01-06 23:10:41

The technical specification of power consumption requires that the resistance of maintenance grounding wire shall be ≤ Ω,BokoDry type transformer applications, The resistor is generally more than & omega;, According to Ohm's law, when the insulating layer is damaged, the current is only / of the total current flow, so as to play a guarantee effect. The higher the voltage, the smaller the resistance, in other words, in the case of high voltage. We can care about the power transformer plant and master a lot of professional knowledge.The long-term overload of power transformer will slowly cause the scalding and insulation aging of solenoid coil, resulting in short circuit between coils, two-color short circuit or short circuit on the ground, resulting in the ignition of power transformer. Therefore the insulation compressive strength of power transformer shall be tested before installation and operation,BokoPrice of 800kVA distribution transformer, and overload is not allowed in the whole process of operation.Boko,The transformer manufacturer said that the temperature display equipment: the temperature change value is measured according to the PT temperature sensor embedded in the bottom voltage winding to immediately indicate the winding temperature of each phase (three-phase safety inspection and Zui large value indication, and the historical time Zui high temperature can be recorded). The Zui high temperature can be input and output as mA analog quantity. If it is to be far away (the distance can reach m, the electronic computer can be equipped with an electronic computer socket, an intelligent transmitter,BokoThree phase transformer 100kW, and transformers can be detected. The over temperature alarm and trip of the system software can also be signaled by the resistor data of Pt thermistor sensor, so as to further improve the stability of the temperature maintenance system software.Therefore, in the installation process of substation equipment, the lightning rod should be set according to the specific situation to prevent damage to the relay protection dry-type transformer caused by lightning. In addition, in the installation and use process of lightning rod, select reasonable types of lightning rod according to the operation situation to determine that they are in the same situation. In addition during the installation of lightning rod, please connect all routes as far as possible to prevent other faults.Poltava, most of it is scattered according to the building structure. This kind of low-frequency noise is scattered to the household house according to the house building, and then causes gas vibration noise, which is then scattered to the ears of consumers. Although the amount of noise is not very large, the dispersion spacing and adverse effects are very large.If the oil immersed transformer is burned by the cover of the transformer, open the lower side of the transformer and place an appropriate part. When the oil immersed transformer is on fire, the oil cannot be released to avoid the occurrence of the oil immersed transformer. At the same time, use detection equipment to put out the fire immediately. In order not to expand the hazard, the fire brigade must be notified.Therefore, in the operation prevention and regulation of relay protection dry-type transformer, it is necessary to find the short-circuit fault point according to the fault situation, lock the fault point, and analyze the short-circuit fault types of relay protection dry-type transformer. At the same time, if all fields are clear, disconnect the switching power supply at the fault point, the maintenance work of employees will be carried out smoothly, a group of overvoltage maintenance high-voltage Arresters (such as ycs active zinc oxide high-voltage arresters) shall be refitted at the working voltage bus duct side of dry-type transformer.A zero line of the power transformer is connected with the working equipment. Since the voltage formed by the server during operation will be sent to the power transformer along with the cable, the power transformer will be transported and sent to the power consuming machines and equipment. What is the zero line of the actual power transformer? Let's introduce it to us.Sampling inspection,Power transformer factoryOperation and maintenance management of oil immersed transformerPower transformers are used in all walks of life


BokoPower transformer designTo inject fresh blood



Causes of fire in power transformertotal cost,Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, uneven companies, lack of evaluation and specifications and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.Noise dispersion of dry-type transformerBoko,Dry type transformer factoryIn order to better reduce the probability of short-circuit fault of relay protection dry-type transformer, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

404 Not Found

404 Not Found


nginx

Related articles

BokoPower transformer designCommon methods of inspection

BokoPower transformer designCommon methods of inspection

When oil samples are used, the safety and fire safety technical specifications on the spot shall be...

评论列表

122HP117294921
2023-01-06 23:24:36

Buying things online is about integrity, and you do it! Thank you BokoPower transformer design Like one Fast delivery, very good attitude, very satisfied! very good!

717HP127443542
2023-01-06 23:35:23

I will buy it in the future BokoPower transformer design and I will come to you again. Thank you boss and send a good comment. I love you boss. Thank you!

709HP180518493
2023-01-07 07:46:01

Your company BokoPower transformer design has a very good service attitude, thank you, and like you.

256HP158312377
2023-01-06 23:38:02

BokoPower transformer design Very satisfied, good quality.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。