PosarikaPower transformer s13-50How to deal with technical service contracts

2022-10-27 11:04:50

() the installation position of secondary commercial insurance of transformer on column and ground shall meet the following requirements: if there is an disconnector on the secondary side,Posarika125 KVA dry type transformer, it shall be installed between the disconnector and low-voltage composite insulator, or the circuit breaker shall be selected as the disconnector; If there is no disconnector on the secondary side, it shall be installed on both sides of the low-voltage composite insulator, and the insulated cable jumper shall be connected to the insulated cable on both sides of the circuit breaker.Use fiber materials to seal the bolts to achieve the goal of controlling leakage. The other is to screw out the bolt (nut), wipe the Fushi blue film remover on the surface, and then tighten it after wiping the raw materials on the surface. After drying, the treatment goal can be achieved.Posarika,Transformer manufacturers said that at this stage, China's energy-saving distribution transformer market is relatively scattered, coupled with the constraints of factors such as low threshold in the field, lack of evaluation and specifications, and inadequate technical innovation, resulting in slow marketing of energy-saving transformers.Power transformerBibiani,Before and after sampling, clean the periphery of the sampling port with clean or hairless linen.On load commissioning:If you want to check the activated carbon fiber for the hanging cover, first take out the low-voltage waterproof sleeve and the on load transformer power switch then lower the bell cover anchor bolt of the large cover, slowly hang the galvanized steel wire rope with sufficient lifting net weight on the commonly used earrings, wear round steel from top to bottom in the surrounding screw holes, and count the spacing and specifications for easy reinstallation. At the same time, the cable wind shall be added on all sides to ensure that the core international body will not be damaged during the whole lifting process. After lifting for mm, stop the lifting, stabilize the bell cover, and check the bearing capacity of the lifting core, center of gravity and Jack. After everything is normal, lift it again until the bell cover exceeds the relative height of the body,PosarikaMaximum capacity of box transformer, and rotate the crane to place the bell cover on the clean skid.


PosarikaPower transformer s13-50How to deal with technical service contracts



Sound, causing short circuit obstruction. If not handled properly, it will cause great damage.The iron loss of transformer includes two levels. The first is the hysteresis loss introduced by the transformer manufacturer. When the AC circuit is based on the transformer according to the magnetic induction line of the transformer ferrite core, its orientation and size change with the change, which promotes the internal molecular structure of the ferrite core to interact with each other, and then loses part of electromagnetic energy, which is the hysteresis loss. The other is the vortex loss when the transformer is working.Avoid aging and damage of power transformer iron core insulation: aging of iron core insulation or damage of waterproof sleeve holding anchor bolt will cause large vortex of iron core, and long-term scalding of iron core will lead to insulation aging.demand,Dry type transformer companyWiring mode of dry-type transformer:Loose core screw


PosarikaPower transformer s13-50How to deal with technical service contracts



Overload or short circuit occurs inside the power transformer. Flammable insulating raw materials are endangered by high temperature and electric isolation, which dissolve and ignite, resulting in a lot of steam bodies, greatly increasing the internal working pressure of the power transformer, causing the ignition of the casing, causing large-scale power failure, endangering all normal production, manufacturing and activities. There are three reasons for fire accidents in the operation of power transformers.production costs,With the rapid development of society and the continuous development trend of computers, the calculation of data in the whole process of oil immersed transformer wave has long had results. Only effective selection of calculation entity models and methods is needed, the accuracy of calculation conclusions can meet the needs of architectural design,Posarika1600KVA dry type transformer size, and scientific and reasonable data method is selected, Not only can the current distribution of the oil immersed transformer be clearly defined in the development stage but also the winding and other structures of the oil immersed transformer can be effectively arranged and distributed in a certain scope, which is resistant to corrosion and rust, and has sound insulation and noise reduction.Posarika,Some are tied with plastic tape and some immediately press the two edges together, because the socket can not be pressed firmly during installation, and there is still oil leakage without sealing effect.Causes of fire in power transformerPower transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.

404 Not Found

404 Not Found


nginx

Related articles

PosarikaPower transformer s13-50Welcome to inquire

PosarikaPower transformer s13-50Welcome to inquire

When the whole process of winding wave of oil immersed transformer is calculated by using the markin...

评论列表

416HP186602172
2022-10-27 12:36:24

PosarikaPower transformer s13-50 Give me a discount next time, I wish you a lot of money

35HP162657470
2022-10-27 12:32:37

PosarikaPower transformer s13-50How much is it and how can I sell it?

409HP184720764
2022-10-27 11:10:15

The quality is very good, exactly the same as the seller’s description, very satisfied, really like it, completely exceeding expectations, the delivery speed is very fast, the packaging is very careful and strict, the logistics company’s service attitude is very good, the delivery speed is very fast, and I am very satisfied One time shopping.

984HP143755493
2022-10-27 12:37:09

The quality is very good, really good, PosarikaPower transformer s13-50 the same as the picture, the packaging and quality are also very good,

122HP117294921
2022-10-27 11:32:10

The quality is very good, really good, PosarikaPower transformer s13-50 the same as the picture, the packaging and quality are also very good,

717HP127443542
2022-10-27 11:31:30

Cooperation with you is really good, PosarikaPower transformer s13-50 good quality, come to our company again if you have time.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。