hamburgerState Grid transformerThe need for regular maintenance

2024-03-19 01:16:26

Seal oil leakageDifference between dry-type transformer and oil immersed transformer:hamburger,At that time, and the market share of high-voltage transformers was basically monopolized by overseas leaders.When the power transformer operates at full load, it needs a large reactive load. This reactive load shall be provided by the power supply and distribution system. If the transformer volume is too large, it will not only increase the initial project investment, but also make the transformer operate at full load or load for a long time, expand the proportion of full load loss, reduce power factor and increase Internet loss. Such operation is neither economic development nor scientific.Luebo,Solenoid insulation deteriorationPower transformer factoryPower transformers are also used for testing, which are called test power transformers. They can be divided into inflatable, oil transformer, dry test and other test power transformers. They are the basic test equipment for communication AC compression test for many consumers such as power stations, power supply bureaus and scientific research institutions. According to the specifications of the Bureau of quality supervision,hamburgerStructural composition of oil immersed transformer, It is used to carry out insulation compressive strength test under required current for various electrical products, electrical components and insulating raw materials.


hamburgerState Grid transformerThe need for regular maintenance



Before no-load impulse closing the transformer shall be placed for h,(III) dry type transformers of KVA and below can be installed on poles. The distance between its bottom end and the road surface shall not be less than m; The distance between the electrified part and the road surface shall not be less than m.The vibration reduction of the grounding device sheet solves the problem of modifying the fixed hard connection between the copper sheet of the grounding device and the dry-type transformer. The original oscillation of the dry-type transformer will be transmitted to the metal in the concrete by the baffle and cause low-frequency noise. Therefore and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.Several detection methods for installing transformerLoose core screwEnergy costs, it must also be changed to produce flexible connection.For kVA power engineering transformer, plastic parts are selected in the middle of iron core, clamp and electromagnetic coil to keep the electromagnetic coil in a stable clamping state to reduce noise.


hamburgerState Grid transformerThe need for regular maintenance



Dry type transformerApplication process, there are screw cap parts left on the iron core, or small metal materials fall into the transformer, the transformer will send out & ldquo; Ding Ding Dang & rdquo; Or & ldquo; Call & hellip; Call & hellip& rdquo; Blowing sound and its & ldquo; Squeak, squeak & rdquo; It's like a magnet sucking a small washer, while the working voltage, current and temperature of the transformer are all normal. Such conditions generally do not endanger all normal operation of the transformer, and can be solved until power failure.It is understood that in China, transformers have experienced the whole process of replacing many series products such as sss. As early as the middle and late s, S Series lossless distribution transformers were selected in China to replace the high energy consumption transformers of jb- and jb - Specifications operating in the power network at that time. Since the th century,hamburgerOn load voltage regulating power transformer, and S series distribution transformers have been used to replace S Series. In recent years, S and S commodities are gradually selected in large quantities in the transformation of urban and rural power networks in China, and their full load loss is % - % less than that of S transformer.Before no-load impulse closing, the transformer shall be placed for h, and the rising seat and waterproof sleeve installed with vent plug shall be deflated on time.hamburger,& ldquo; YN, D & rdquo;, in which indicates that when the working voltage phasor of the primary side line, as the minute hand, refers to the position at o'clock,hamburgerPower transformer specification, the phase voltage phasor of the secondary side is at o'clock. That is the phase voltage UAB of the secondary side lags degrees behind the working voltage uab of the primary side line (or degrees ahead).The key reason for oil leakage is that there are defects in cast iron partsIt includes the performance and main uses of insulating layer materials, various insulating layer parts, component manufacturing processes and quality standards; Performance and main uses of various wires, coil inductance process of various ways of electromagnetic coil, solution process and quality standard, overall suit process and quality standard of electromagnetic coil; Main performance parameters of ferrite core, cutting process of iron chip, core stacking process and quality standard, production process and quality standard of electromagnetic shielding.

404 Not Found

404 Not Found


nginx

Related articles

XuanhuaSmall electric hydraulic elevatorWhat is unique

XuanhuaSmall electric hydraulic elevatorWhat is unique

The use of standard section connecting bolts should comply with the user manual and specification re...

HongshanHow to start the lifting platform carWhat is the feasibility of

HongshanHow to start the lifting platform carWhat is the feasibility of

To understand the operation of the mechanism, it mainly depends on whether it is normal and whether...

AsperniLifting hydraulic lifting platformHigh experience and technology

AsperniLifting hydraulic lifting platformHigh experience and technology

The entire elevator is made of high-strength aluminum profiles, which have high strength, beautiful...

ShufuFully self-propelled elevatorReasons for the increase in production

ShufuFully self-propelled elevatorReasons for the increase in production

Precautions for elevator installation: Keep the access road of external construction elevators smoot...

Ensad2 meter high electric elevatorThe maintenance points of these points should be done well

Ensad2 meter high electric elevatorThe maintenance points of these points should be done well

regularly maintain and extend its service life, and create greater benefits for the enterprise. Wha...

placeHorizontal slurry pumpWhere is the bottom of the fall

placeHorizontal slurry pumpWhere is the bottom of the fall

   Precautions for disassembly of submersible slurry pump Before disassembling the filter press, ma...

评论列表

263HP148803710
2024-03-19 08:38:55

Since the last time I bought your hamburgerState Grid transformer, this new model has indeed met the standard and is very good, giving you a good comment.

881HP198728332
2024-03-19 09:37:47

hamburgerState Grid transformerYes, give you a good comment

605HP153695373
2024-03-19 09:11:32

Very good buyer. Thank you. My colleagues like it very much hamburgerState Grid transformer. Come again next time

717HP127443542
2024-03-19 09:13:55

I’ve been too busy lately, the confirmation is late, the quality is good, hamburgerState Grid transformer genuine, good quality and cheap, haha.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。