YuciTeniIntroduction and working principle characteristics

2023-07-30 11:33:21

To meet the needs of stage craftsmanship and layout; Product; In the music and dance theater stage arranged in a zigzag pattern, auxiliary lifting platforms are often arranged in front,YuciSexad, back, left and right of the main stage lifting platform. The side and rear auxiliary lifting platforms are used for the smooth opening of the side platform and rear vehicle turntable, while the front auxiliary lifting platform is used to place the rear vehicle turntable near the platform entrance. The leveling and lifting platform below the side platform and rear vehicle turntable can be used to level the platform after the side platform or rear vehicle turntable is driven out,YuciHorqin , so that the entire platform does not have a height difference, ensuring the safety of the cast members.Secondly, for the replacement of hydraulic oil on the lifting platform, it is recommended to replace it every three months. If the frequency of use is not high, it can be replaced once a year. The hydraulic oil must be clean, and after changing the hydraulic oil, it must be automatically lifted and lowered to times to ensure that the air in the oil cylinder is completely discharged, maintain sufficient space, and ensure that the lifting platform can be lifted to the rated lifting height.YuciThe detailed reason why water cannot be used to flush the hydraulic station is that doing so will corrode the oil tank in the hydraulic station, and once water is mixed in the hydraulic station, the damage to the hydraulic system is very large. Therefore, it will simply form pipeline corrosion, water vaporization, and other phenomena that can cause adverse effects or results for hydraulic electric elevators. Therefore, it is necessary to prevent such actions to ensure the normal operation and service life of the hydraulic station.Before installation, the installation unit should confirm that the foundation, foundation bearing capacity, embedded parts, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.the republic of korea,Acceptance: Concrete strength grade C, strength testing report.When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, but safety should be maintained.The use of a lifting platform as a tool for storing performance blankets, soft scenery, etc. In some theaters, there is a soft scenery storage lifting platform located at an appropriate location on the stage for the storage of blankets, soft scenery, etc.


YuciTeniIntroduction and working principle characteristics



The bearing capacity of the building structure at the attachment point of the wall bracket should meet the requirements specified in the user manual for construction electric elevators.Mobile electric elevators are divided into: four wheel mobile lifting platform, car modified lifting platform, manual lifting platform, manual lifting platform, and AC/DC dual purpose lifting platformHorizontal lead screw mechanical electricityRespect for customers,The foundation base or embedded parts should be fully embedded in the concrete foundation plate.Setting requirements: The main connection methods between the wall bracket and the building include: connecting the wall bracket with the embedded parts on the wall; Fix with wall bolts; Embedded bolts; Welding with steel structures.Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.


YuciTeniIntroduction and working principle characteristics



Setting requirements: The anti loosening and anti loosening parts between the connecting parts should comply with the provisions of the user manual and should not be replaced by other objects. For connecting bolts with pre tightening requirements, a torque wrench or special tool should be used to accurately tighten the bolts to the specified torque value according to the specified tightening sequence. When installing standard section connecting bolts, it is advisable to place the screw at the bottom and the nut at the top.Test results,YuciLeipzig,The connection method and angle between the wall bracket and the building structure should comply with the requirements of the user manual.Before use we should observe whether there is any damage to the electric elevator. We can conduct a no-load test to raise and lower it. If there are any damaged parts, they should be replaced in a timely manner to prevent major accidents.The distance between the electric hoist and overhead line in Electrical safety construction shall meet the specification requirements, otherwise protective measures shall be taken.Yuci,Then, and no deviation of one side is allowed. The lifting of goods does not allow people to stand on both sides of the platform, and the lifting of goods should try to maintain a stable and uniform speed.Setting requirements: Before starting work every day and changing shifts, the driver of the construction electric elevator should inspect the construction electric elevator according to the requirements of the user manual and specifications, record the inspection results, and report any problems found to the user unit.Safety grounding device. In order to protect against electrical equipment. The metal casing of electrical equipment and the metal structure of electric elevators should be equipped with a safety grounding device. The grounding wire should operate multiple wires, and the neutral wire should not be arbitrarily held as a safety grounding wire. Its grounding resistance should not exceed ohms; The power supply of the electric elevator can be cut off.


标签: YuciTeni
404 Not Found

404 Not Found


nginx

Related articles

ArxanHydraulic test platformDevelopment momentum and type introduction

ArxanHydraulic test platformDevelopment momentum and type introduction

When using a lifting machine, you must first get your legs. If the legs are not prohibited, lift it....

Las LomasPrinciple of power transformerCommon sense of value selection

Las LomasPrinciple of power transformerCommon sense of value selection

& ldquo; of wiring transformer; Enter & rdquo; And & ldquo; Output & rdquo; Use a megger to test the...

YuhuaStage electric elevatorClick to view

YuhuaStage electric elevatorClick to view

The requirement for the shaft is that it should not be plastered, which is beneficial for reducing n...

FotYuciReduce radioactive pollution

FotYuciReduce radioactive pollution

FotGansu,When the distance between the outer edge of the construction electric elevator and the edge...

EnsadXinxiang hydraulic lifting platformHow to solve the abnormality

EnsadXinxiang hydraulic lifting platformHow to solve the abnormality

The application scenarios of mobile elevators may require several or even dozens of passenger elevat...

WazeFixed scissor fork type elevatorHow to sell industry fresh information

WazeFixed scissor fork type elevatorHow to sell industry fresh information

The oil cylinder is built into the platform.Car mounted curved arm elevator: Install the curved arm...

评论列表

881HP198728332
2023-07-30 11:48:32

Can you give me YuciTeni detailed specification data?

938HP166090698
2023-07-30 12:35:51

Since searching and shopping online, you never have to go out and wander around. Your YuciTeni quality is guaranteed, logistics and delivery are fast, big brands are better than offline stores, and I will review them if necessary in the future!

914HP134131469
2023-07-30 12:50:02

When YuciTeni offer discount points for activities, contact me when there are discounts

779HP136589660
2023-07-30 12:48:19

Dear, YuciTeni I received it, I love it very much, the workmanship is nothing to say, haha, the service attitude is also super good, a very caring seller, I will frequent it in the future.

965HP113924865
2023-07-30 13:17:22

When YuciTeni offer discount points for activities, contact me when there are discounts

416HP186602172
2023-07-30 13:13:32

Can you give me YuciTeni detailed specification data?

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。