Gu YeFixed hydraulic boarding bridgeInspection requirements during installation

2023-09-12 01:38:36

Point. The DCQY type is a hand operated variable amplitude type, operated by a hand pump, which can achieve variable amplitude on the bridge board without the need for power supply; Widely used in mobile loading and unloading places without loading and unloading equipment and loading and unloading platforms; It is a safe, reliable, time-saving land-saving logistics machinery that solves high-altitude differential operations.When using the boarding bridge for loading and unloading, load and unload according to the rated load, and do not be overweight. If overweight occurs, it will make the hydraulic system struggle during the lifting process, and even cause deformation of the hydraulic cylinder body, resulting in gaps and oil leakage outward. This requires finding a professional manufacturer for maintenance, such as Shanghai Niuli Machinery. If the deformation is severe, the only option is to replace it with a new one.Gu Ye,Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various vehicles on loading and unloading sites and places with relatively busy traffic. Loading and unloading platforms, lifting platforms, and unloading platforms: anti slip device: This device is welded from steel plates, which can effectively achieve anti slip function and is safe and reliable.At the beginning,Gu YeFixed electric hydraulic boarding bridge, it is essential to inspect and maintain the fixed hydraulic boarding bridge before or after use,In general, there are several reasons for hydraulic cylinder oil leakage: damage to the oil seal ring on the cylinder, etc. The cylinder body of the oil cylinder is damaged. Oil leakage caused by defects such as air holes, sand holes, and shrinkage porosity in the guide sleeve.The fixed boarding bridge of the service platform is immediately installed on the outer edge of the unloaded service platform during the entire installation process. When applied, there is no need to excavate or pre bury the indoor space of tunnel construction on the loading and unloading platform, and most of the buildings do not need to be modified in terms of structure.Anti collision block: This device can effectively protect buildings and boarding bridges from damage.


Gu YeFixed hydraulic boarding bridgeInspection requirements during installation



The hydraulic boarding bridge is mainly made of anti slip thick steel plates during the production and manufacturing process, and all equipment can provide good anti slip characteristics to a certain level in operation and application. The hydraulic press loading bridge is a specialized auxiliary equipment that maintains rapid loading and unloading of goods. Its height adjustment function creates a bridge between the large truck and the cargo platform in the warehouse. Transport vehicles such as electric forklifts can immediately enter the large truck to carry out mass loading and unloading of goods, also known as the loading and unloading service platform. That way, the device can loosen the return valve button during the lowering process thereby reducing the weight of the device.High strength& quot; U& quot; The design of the shaped beam can ensure its high load and long-term operation without deformation.The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms.technological innovation,Point. The DCQY type is a hand operated variable amplitude type, operated by a hand pump, which can achieve variable amplitude on the bridge board without the need for power supply; Widely used in mobile loading and unloading places without loading and unloading equipment and loading and unloading platforms; It is a safe, time-saving, land-saving logistics machinery that solves high-altitude differential operations.The platform type boarding bridge is also designed in various structural forms according to different on-site conditions. It can also be adjusted up (below the cargo platform) or down (below the cargo platform) within a certain range, which can meet the installation and use of most loading and unloading platforms.Anti collision block: This device can effectively protect buildings and boarding bridges from damage.


Gu YeFixed hydraulic boarding bridgeInspection requirements during installation



The anti slip device of the auxiliary equipment for loading, and handling of goods applied: This equipment is made of thick steel plate welded by electric welding, which can reasonably maintain the anti slip effect and can be trusted. It is a long-term operating boarding bridge factory. Welcome to inquireManagement Department,Of course, due to frequent shipments, long operation time, and large carrying capacity, the quality of fixed hydraulic boarding bridges has been greatly tested. Based on market analysis, the editor above provides some suggestions to enemies who have used fixed hydraulic boarding bridges, and pays attention to some achievements in the application process.Firstly, before using the equipment (shè bè i), it is necessary to check whether there is water accumulation in the points, and then confirm whether the fasteners are damaged or loose. If a fault is detected, necessary repairs and replacements need to be carried out. Check all control devices (zhu ā ng zhì) Whether the operation is normal, whether the switch and governor are in good condition, whether the movement and working speed are stable,Gu YeFixed hydraulic boarding bridge, and whether the display is normalFixed loading and unloading bridge: The fixed loading and unloading bridge is a specialized auxiliary equipment for achieving rapid loading and unloading of goods. Its height adjustment function uses a bridge between the truck and the cargo platform in the warehouse, and forklifts and other vehicles can move and load goods in batches inside the truck. Only one person can work to achieve rapid loading and unloading of goods. It enables enterprises to reduce a large amount of labor, improve work efficiency, and obtain greater economic benefits.Gu Ye,Gu Ye10 ton mobile boarding bridge,The problem of sealing ring damage is common in almost all hydraulic systems, such as oil cylinders. It may be due to poor quality of the sealing ring itself, insufficient compression of the sealing ring, etc. When the sealing ring is lifted and lowered for a long time, it causes varying degrees of wear and tear on the sealing ring. This is a common cause leading to gaps in the sealing performance of the sealing ring, only the damaged sealing ring needs to be found, Just replace it with a new one.Anti collision block: This device can effectively protect buildings and boarding bridges from damage.When using the boarding bridge for loading and unloading, load and unload according to the rated load, and do not be overweight. If overweight occurs, it will make the hydraulic system struggle during the lifting process, and even cause deformation of the hydraulic cylinder body, resulting in gaps and oil leakage outward. This requires finding a professional manufacturer for maintenance, such as Shanghai Niuli Machinery. If the deformation is severe the only option is to replace it with a new one.


404 Not Found

404 Not Found


nginx

Related articles

Gu YeFixed hydraulic boarding bridgeconsult

Gu YeFixed hydraulic boarding bridgeconsult

Function: Convenient unloading, strong stability, and low maintenance cost. Suitable for various veh...

评论列表

161HP196399230
2023-09-12 09:27:21

My colleagues like it very much. Come again next time. It's a rare genuine product. Gu YeFixed hydraulic boarding bridge I'm very satisfied with it. The boss has a good personality, awesome. Not bad. The quality is good. The speed is also fast. Really good!

323HP155335083
2023-09-12 09:59:47

The stuff is really good, but Gu YeFixed hydraulic boarding bridge the price is a bit more expensive, but it is still worth the money. This is the first time I bought it, thanks to your shopping guide.

779HP136589660
2023-09-12 09:06:04

The boss is so kind, he really knows his job well. Under your guidance, I will soon become an expert! The seller's service is really attentive. Bring colleagues together in the future. Very good Gu YeFixed hydraulic boarding bridge. Thank you.

984HP143755493
2023-09-12 08:49:18

Gu YeFixed hydraulic boarding bridge It’s good, the price is right, friends also say it’s good, it’s worth it

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。