MaypenCold storage manufacturing and installationThree common problems

2023-09-21 04:39:35
632HP195506591energy107

When outdoor air enters the cold storage body, it will not only increase the cold consumption of the cold storage, but also bring water into the warehouse. The condensation of water will lead to the building structure, especially the heat insulation structure, being damaged by moisture and freezing. Therefore, a moisture-proof and heat insulation layer should be set to keep the cold storage board building moisture-proof and air-proof performance and good sealing.Preparation,MaypenFresh and cold storage installation company, prepare the project planning of cold storage and prepare the construction site and construction materials. All kinds of materials for cold storage construction are customized according to the needs of customers. Sort out the construction site that meets the requirements, transport all installation materials to the construction site check the material quality and model, and start the installation of cold storage after confirmation.Maypen,The electrical equipment of the fresh-keeping warehouse equipment shall be prevented from moisture return to prevent it from being caused by power failure.Watertight polyurethane rigid foam has low water absorption, good permeability to water vapor, and state of foam pores. It is not connected with each other, and the obturator rate is more than %. It is a dense microporous foam material, which is more dense than the surface of the air, and is not easy to permeate. It is an hydrophobic material.Saigu,Cold storage is fireproof, flame retardant and high resistance. Professional cold storage installation, cold storage installation cold storage construction, fruit preservation cold storage, old brands, price advantages and guaranteed quality. Polyurethane is a flame retardant self extinguishing material after adding flame retardant. Its softening point can be above degrees Celsius and will only be decomposed at higher temperatures. In addition, the ash formed on the surface of polyurethane will be in its foam, and this ash will help isolate the foam below. It can effectively prevent the spread of fire. Moreover, polyurethane will not produce harmful gas at high temperature.Core tip: in the cold storage project, only with sufficient cold storage installation skills can we ensure that the cold storage is more energy-saving and power-saving after installation, and is not prone to failure convenient use and management and long service life.Whether there is dirt on the condenser and poor heat dissipation will lead to too high condensation pressure of the refrigerator. In order to protect the compressor, the machine stops running under the action of the pressure controller. When the heat dissipation is good, press the black reset button on the pressure controller, and the machine can automatically resume operation.


MaypenCold storage manufacturing and installationThree common problems



The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, most cold storages are constructed with single-layer steel structure, unloading platform, refrigeration system, system, pipeline system, the logistics cold storage project will be equipped with supporting electric cold storage doors and electric rolling shutter doors in the design of cold storage doors, which is easy to cause serious loss of refrigeration capacity and is not suitable for logistics refrigerators that often go in and out.The machine room of ammonia refrigeration system shall be equipped with exhaust assembly; The exhaust fan shall adopt anti motor. When the power supply is cut off due to unexpected refrigeration, it shall be able to ensure the reliable power supply of the exhaust fan. The overload protection of the exhaust fan should be applied to the signal alarm system without directly stopping the exhaust fan. The button box of the exhaust fan shall be concealed in the wall outside the ammonia compressor room.Online consultation,Cold storage is fireproof, flame retardant and high resistance. Professional cold storage installation, cold storage installation, cold storage construction, fruit preservation cold storage, medical cold storage and other special products, old brands, price advantages and guaranteed quality. Polyurethane is a flame retardant self extinguishing material after adding flame retardant. Its softening point can be above degrees Celsius and will only be decomposed at higher temperatures. In addition, the ash formed on the surface of polyurethane will be in its foam, and this ash will help isolate the foam below. It can effectively prevent the spread of fire. Moreover, polyurethane will not produce harmful gas at high temperature.The construction structure of structural cold storage can be brick concrete structure or steel structure, which can be determined according to their own budget and actual needs. At present, and are equipped with combined thermal insulation storage body, unloading platform, refrigeration system, system, pipeline system, etc. according to the actual needs of cold storage circulation.The two sets of connectors between the cold storage shall be wedged tightly, and the two sets of connectors shall be fixed at the upper, outer and lower sides of the cracks in the cold storage respectively. The lower connector shall be as close as possible, so as to facilitate the use of concrete to cover the connector in the future.


MaypenCold storage manufacturing and installationThree common problems



Refrigeration system: refrigeration system is the core part of cold storage design. It is the key to determine the economy, environmental protection and performance of cold storage.device management,Installation of unit electrical box: the unit electrical box shall be installed near the unit; Vertical installation. If the unit is installed on the top of the warehouse, the distance between the box bottom and the top of the warehouse must be & amp; gt; mm; The electrical box can be fixed on the building wall or on the angle steel frame.If the cold storage is in the building, the load-bearing of the cold storage should be considered. That is, after the fruit is loaded in the cold storage, whether the floor can bear such weight.Insufficient refrigeration dose and capacity in the system: there are two main reasons for insufficient refrigerant circulation,Maypen,The drainage at the outlet of the cooling fan, the drainage of the volatile cooler and the road drainage of the refrigerated warehouse storing food or drinks shall not be immediately connected with the sewage and wastewater pipeline system software, but indirect drainage shall be adopted. For the flushing (thawing) water drainage of each layer in the double-layer cold storage, an exhaust valve equipment shall be set in front of the main riser for flushing (thawing) water drainage.Cold storage design segmentation: several different partitions shall be reasonably planned and divided according to purpose and temperature. For example: processing room, sorting room, quick freezing room, refrigeration room,MaypenQuotation for design and installation of cold storage,MaypenRefrigerator manufacturer, channel, unloading platform etc.The factors affecting the installation cost of cold storage are as follows: cold storage construction: the site selection shall comply with laws and regulations and meet the relevant requirements for food hygiene and. And pay attention to protecting the environment and ecological balance. In addition, it shall be conducive to production, construction and dry ceremony.

404 Not Found

404 Not Found


nginx

Related articles

ElmosaConstruction and installation price of cold storageClassified news

ElmosaConstruction and installation price of cold storageClassified news

if the supporting steel beam has been installed in the warehouse, the top warehouse plate and the s...

prince Albert How much is the installation of the freezerThe unique embodiment state of

prince Albert How much is the installation of the freezerThe unique embodiment state of

the cold storage that only circulates vegetables can only build a fresh-keeping cold storageThe typ...

ChakaritaPharmaceutical plantCritical stress of industry

ChakaritaPharmaceutical plantCritical stress of industry

According to the size and nature of the cold storage area and in combination with local regulations,...

KalinkavicProfessional cold storage installationBasic terms of

KalinkavicProfessional cold storage installationBasic terms of

Thermal insulation performance of thermal insulation materials for food cold storage the requirement...

BelgiumHow much is the charge for installing cold storagePrinciples of industry distribution

BelgiumHow much is the charge for installing cold storagePrinciples of industry distribution

First, use a hammer to pad the wood on the polyurethane warehouse board between the two warehouse bo...

ChilpansingoInstallation price of refrigeration warehouseThe current situation of the industry is good and sustainable

ChilpansingoInstallation price of refrigeration warehouseThe current situation of the industry is good and sustainable

During the use of the goods yard medical cold storage project, the stored goods must be in strict ac...

评论列表

391HP142030639
2023-09-21 12:01:16

MaypenCold storage manufacturing and installation Not bad, the price is worth it, just right.

173HP199071655
2023-09-21 12:57:14

MaypenCold storage manufacturing and installation I received it, the seller delivered the goods very quickly, the logistics is also very good, the customer service attitude is excellent, very patient, giving people a kind of intimacy, and I really like it. There are also exquisite packaging and high-end atmosphere. It can be seen that the merchants are very careful. MaypenCold storage manufacturing and installation It's really good, it matches the picture, there is no difference, it is really good value for money.

122HP117294921
2023-09-21 13:32:43

It is still affordable to buy things online, MaypenCold storage manufacturing and installation I signed for two days late, but the things are really good, and the boss is good. The speed of transportation is also very fast.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。