Nai on Seine10 meter electric lifting platformService purposes
2024-01-03 00:24:36The wall bracket of the construction electric elevator should be intact and reliably fixed, and its attachment distance, wall bracket spacing, and end height must comply with the requirements of the 'User Manual'. The angle between the plane of the wall bracket and the normal direction of the attachment surface should not exceed degrees;. When the attachment device does not meet the requirements of the 'User Manual' due to conditions, its calculation sheet, design, and production materials should be confirmed by the manufacturer or reviewed by the technical leader of the installation unit, and verified by experts.Mechanical devices controlled by cage movement should not be used to open or close the landing door.Nai on Seine,When a suspension cage with a rated load capacity acts on the buffer at a speed greater than the rated speed of .m/s, the average deceleration of the suspension cage should not exceed g, it is necessary to avoid irregular operations. To ensure the normal and orderly operation of the lifting platform and achieve the ideal unloading level the lifting platform is driven by electrical energy and lifted by the hydraulic system. During operation, timely inspection of various functions is essential.Az Zuwaytinah,Setting requirements: The spacing of wall brackets along the vertical direction should comply with the provisions of the user manual.After the electric elevator passes the inspection, the user unit shall organize the leasing unit, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting, the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.When a rigid mm square or circular flat surface is applied with a normal force of N to either side of the door, the door may not meet the above requirements, but safety should be maintained.
Double layer steel mesh: The diameter of the steel bars is mm, with a spacing of mm.Afterwards, it should be scrapped.Chain type electric lifting mechanism: With a good guiding mechanism,Nai on SeineSmall electric winch elevator, it can ensure that the equipment does not tilt during operation. Gear and rack electric lifting mechanism: precise transmission and high cost.Let's see,Drivers of construction electric elevators should hold special construction operations and are not allowed to operate without a certificate.The angle between the wall bracket and the horizontal plane should comply with the requirements of the user manual.Emergency manual valve: In case of power failure, it can cause the car to descend to the nearest floor position and open the door
After the electric elevator passes the inspection, the user unit shall organize the leasing unit,Nai on SeineInstallation of electric elevators for fire protection, installation unit, and supervision unit to conduct acceptance. For the implementation of construction general contracting the acceptance shall be organized by the construction general contracting unit. The acceptance form should be signed by the relevant responsible person.Analysis project,When the landing door is closed, the full width of the lifting passage opening should be covered.When a single steel wire rope is excessively stretched, the Electrical safety device shall stop the operation of the electric lift.The use of standard section connecting bolts should comply with the user manual and specification requirements.Nai on Seine,Once again, weekly inspections should be conducted to check whether the connecting screws at various parts of the lifting platform are tightened, whether the sealing rings are damaged or ineffective, whether there is a lack of hydraulic oil, and whether the oil cylinder is leaking. It is necessary to clean the lifting frame, scissors, and oil cylinder once a week to avoid dust and debris affecting normal operation.Before installation, the installation unit should confirm that the foundation foundation bearing capacity, and foundation drainage measures of the installed construction electric elevator and auxiliary heavy equipment comply with the requirements of the special construction plan for the installation and dismantling of the construction electric elevator based on the construction electric elevator foundation acceptance form, concealed engineering acceptance form, and concrete strength report.The verticality of the guide rail frame should meet the requirements of the specifications.