BasterSupport advance small conduitWhat about wrinkling in the production process

2023-12-13 02:46:45
965HP113924865Building materials74

The small editor of the grouting pipe reminds everyone that there should be no rust, water and other impurities when using the prestressed machinery. The working clip can be used after removing the foam in the packing box, and the grouting pipe should be properly kept. However, when the prestressed tendon is long and the grouting pipe needs to be tensioned repeatedly, it is suggested that a small amount of lubricant (e.g. anchor pulling spirit) be applied to the tapered hole of the anchor plate by the prestressed machine, which is not only conducive to the follow-up and anchor pulling of the working clip, but also conducive to the multiple grouting of the grouting pipe; Apply lubricant on the outer surface of the tool clip and the inner and outer surfaces of the taper hole of the anchor plate before use and regularly remove the debris on the clip surface to make the anchor flexible. However, when the clip is cracked or the tooth surface is damaged, it needs to be replaced and can not be used again. The wellhead clamp head is connected to the lower clamp head of the drive head. Some driving of grouting pipe.Baster,Foshan Shengda building materials introduction product advantages Simple installation, complete set; The grouting pipe can be intercepted at the construction site according to the actual required length of the joint (it is recommended that the longest grouting outlet length should not exceed m); No special installation equipment is required; Grouting time can be arbitrarily selected; When grouting is carried out internally under the pressure, the grouting pipe liquid can keep uniformly filling the whole pipe; The system allows grouting under relatively low pressure; The installation will not affect the characteristics of the building grouting pipe; The installation or grouting process will not harm the concrete; Permanent sealing can be ensured after grouting; ten It has good air tightness, low gas permeability, strong sealing and no leakage.Bahawalnagar, The grouting pipe is a patented product. Compared with similar products in the market, it has higher tensile resistance and better sealing performance.Appropriate measures shall be taken to prevent surface water, curing water and garbage from falling in. When necessary, a sump shall be set near the post cast strip of the base plate in combination with the design of the basement plane drainage system to facilitate the final cleaning before the grouting pipe is cast. When advance water stop is not used a sump shall be set, which can be set in the basement according to the above method, or set outdoors as a temporary facility. Usually, we use the waterproof scheme between the grouting pipe and the water surface or before, and there are many methods for the grouting pipe to stop water in advance. It should be noted that the design unit should participate in the review of the construction organization design of the basement, so as to determine a complete implementation scheme of advanced water stop before the excavation of the foundation pit and the pouring of the cushion. Otherwise, the design modification requirements will be put forward only when problems are found in advance water stop during construction, which will affect the integrity and rationality of the whole water stop scheme.The mesh structure of the grouting pipe can make the pore water pressure dissipate faster and effectively accelerate the drainage and consolidation of the soft soil of the foundation. This is very important for strengthening soft clay foundation. Precautions for grouting pipe installation: when tensioning the prestressed reinforcement, it shall be loaded from zero to the initial tension at the starting point of the measured elongation value, and then loaded to the required tensioning force by stages; Stress control and elongation check shall be adopted for tensioning management of prestressed reinforcement. The allowable deviation between the actual elongation value and the calculated elongation value is - % ~ + %. If the value is exceeded, the tensioning shall be suspended; Tensioning can be continued only after taking measures to adjust; If the elongation value is too small, over tensioning measures can be taken, but the tensioning force limit shall not be greater than .fptk; In the multi wave curve prestressed reinforcement, in order to increase the tensile stress at the inner support and reduce the tensile stress at the lower mouth of the grouting pipe after tensioning, the technology of over tensioning and loosening can be adopted; The duct grouting shall be dense,Baster48lead small conduit, and the strength grade of cement slurry shall not be lower than C. Before grouting, the duct shall be wet and clean, the grouting shall be carried out slowly and evenly without interruption, and the exhaust shall be smooth. If the hole is blocked, the pressure should be increased to .-.mpa, and the grouting holes should be closed later. The grouting pressure of the vertical duct shall be determined according to the grouting height; For the duct grouting of multi span continuous prestressed tendons connected by connectors,Baster50lacrimal duct, one span shall be grouted after tensioning, and it is not allowed to grout once after all the spans are tensioned; The exposed length of the prestressed reinforcement grouting pipe after fixation shall not be less than mm, and the grouting pipe shall be protected with end sealing concrete. When it needs to be exposed for a long time, measures to prevent corrosion shall be taken; When the steel strand has floating rust, please remove the floating rust and dirt of the steel strand at the fixed clamping section of the grouting pipe and its outer end, so that the floating rust and dirt will fill the red groove of the clamping piece during installation and tensioning and cause wire sliding; The tool clamping piece is three pieces and the working clamping piece is two pieces. The two cannot be mixed. The working grouting pipe cannot be used as a tool and the grouting pipe cannot be reused; The grouting pipe shall be kept properly and shall be free of rust, water and other sundries during use. The working clip can be used after removing the foam in the packaging box. However, it is recommended to apply a small amount of lubricant (such as withdrawing the grouting pipe) in the conical hole of the grouting pipe plate, which is not only conducive to the follow-up of the working clip and withdrawing the grouting pipe but also conducive to the multiple grouting pipe fixation of the grouting pipe; The outer surface of the tool clip and the inner surface of the conical hole of the grouting tube plate shall be coated with lubricant before use, and the debris on the clip surface shall be removed frequently to make the grouting tube flexible. However, when the clip is cracked or the tooth surface is damaged, it shall be replaced and shall not be used again; Safety measures shall be taken during tensioning, and no one shall stand after tensioning the jack; The grouting pipe solid system shall be used together and shall not be mixed with other systems. If the static load test is to be conducted, please clean the clamp with organic solvent (such as gasoline) and wipe the anti rust oil of the grouting tube plate hole, otherwise the solid performance of the grouting tube will be affected; The pile foundation grouting pipe is an important channel product for pile foundation depth detection. It has two main s, one is as a channel,BasterAdvance small conduit in stock, and the other is as a pipe for grouting at the bottom of the pile.


BasterSupport advance small conduitWhat about wrinkling in the production process



Glass fiber grouting pipe is a semi-rigid product made of glass fiber as raw material, high-strength alkali free glass fiber through a certain warp knitting process, and fiber filament coated on both sides. Clay grouting: the slurry material is mainly clay, including clay cement slurry.Before the installation of the grouting pipe, it is necessary to check whether the processed support is vertical to the grouting pipe fitting, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.target,When the pipe cannot be connected due to serious blockage, the following treatment principles must be followed: when it is the first pile of a certain bridge, core drilling detection must be carried out; when it is not the first pile of a certain bridge, the construction unit shall apply for changing the detection method The low strain reflection wave method or high strain strain strain measurement method shall be used and signed by the supervisor&#;s representative and the person in charge of quality supervision before implementation; In case of pipe blockage of a bridge for many times, core drilling inspection shall be carried out in due time. Common problems and answers of grouting pipe what is the pressure inside the grouting pipe?In the construction of some grouting pipes, after the completion of the construction of the project, because some construction personnel did not take protective measures after the completion of the grouting pipes, the project was damaged due to some external factors. In order to help users effectively improve the construction quality of the grouting pipes, the following article introduces the protective measures that should be taken after the completion of the construction of the waterproof layer of the grouting pipes. For various engineering designs, waterproof and water stop shall be carried out throughout the whole process of grouting pipe until the backfilling soil is completed.At the same time, because the space in the grouting pipe restricts the lateral sliding and rolling of the soil particles inside, the relative displacement trend or relative displacement also occurs between this part of soil particles and adjacent soil particles, resulting in friction. This friction force is generally called 'bite force' or 'lateral force resistance'. The 'surface friction' and 'bite force' make the slip and roll of soil particles under the force of the upper limit line at the location of the grouting pipe, introduces the construction technology and process in the construction of preventing the reflection crack of the road surface, and proposes a new technology of sprinkling a layer of filler in the grouting pipe network when paving the surface course. As a kind of road reinforcement material, grouting pipe is widely used in road maintenance engineering because of its advantages of simple, fast construction and low investment.


BasterSupport advance small conduitWhat about wrinkling in the production process



The overhead type is a special rack installed at the bottom of the driving head and connected with the wellhead tensioning equipment.High quality brand, Low cost, fast time, no loss, free from climate and place constraints.Grouting repair can be carried out with good repair effect. No recurrence and low cost.Before the installation of the grouting pipe, and correct the non vertical support; Then install the grouting pipe on the bracket and fasten it.Baster,It is required to ensure that at least one embedded reinforcement is firmly welded with the anchor ring of maolehan grouting pipe within every meter along the joint direction. The quality of XF type grouting pipe should be carefully checked. If deformation or inconsistent spacing between two steel beams is found, it should be repaired. If necessary, the steel beam spacing of maolehan grouting pipe shall also be adjusted according to the ambient temperature during installation. XF type grouting pipe device shall be slowly put into the groove so that the center line of the joint coincides with the center line of the actual reserved joint, and the deviation shall not exceed mm. Meanwhile, the inner edge of the steel side beam shall be kept vertical. After the XF grouting pipe is in place, the top surface of its steel beam shall be adjusted according to the longitudinal, transverse slope and elevation to be ~ mm lower than the adjacent asphalt concrete pavement and shall not exceed the pavement elevation. Low cost, fast time, no loss, free from climate and place constraints.The quality of the steel upsetting head of the grouting pipe is not directly related to its own quality, but the excessive strength will be harmful to the quality of the upsetting head. Therefore, when you choose the upsetting head anchor, you should explain it in detail to the manufacturer in the order. The grouting pipe shall be cut with a toothless saw (grinding wheel clamp). Cutting by electric or gas welding is easy to damage the surrounding surface and cause local heating at the end which significantly reduces its performance. During the use of the grouting pipe, it is forbidden to take any form of heating deformation measures to avoid reducing the mechanical properties of the grouting pipe.


404 Not Found

404 Not Found


nginx

Related articles

BasterSupport advance small conduitWhat about wrinkling in the production process

BasterSupport advance small conduitWhat about wrinkling in the production process

Action mechanism of grouting pipe: the grouting pipe is a flexible material. Under the action of so...

评论列表

323HP155335083
2023-12-13 10:39:10

BasterSupport advance small conduit Very good, but the logistics company is slower, but the product is very good, o(∩_∩)o...

224HP159430236
2023-12-13 10:03:18

The logistics of BasterSupport advance small conduit is a bit slow. Overall it's good, I hope I have a chance to cooperate next time

570HP155642700
2023-12-13 11:19:09

BasterSupport advance small conduit How's the market trend recently, do you know anything?

263HP145816628
2023-12-13 09:58:46

The first time I found what I wanted BasterSupport advance small conduit, I was in a good mood! Boss, come on, I hope to continue to make good products.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。