YingzeAluminum alloy high-altitude lifting platformWhat are the basic conditions

2023-12-02 11:23:59

Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Please note that there should be a space of over mm left on both sides of the escalator, and when arranged in parallel, there is no restriction between the two escalators.Yingze,Will the elevator quickly fall during a power outage& mdash;& mdash; Some movies and TV dramas often mislead the public into thinking that if the elevator loses its power, it will lose control and engage in falling movements.The beam edge distance is too small: The method of shortening the lower platform is to shorten the total length of the escalator, but note that the range of shortening is very limited, generally not exceeding mm. Generally, the platform cannot be shortened because it contains equipment such as cabinets and motors. Change the angle of the escalator from degrees to degreesPradera,Brick concrete structure elevator shaft: For unfinished brick structure shafts users can be required to make a circle of beams at a certain height, arranged on three sides and disconnected on one side of the elevator entrance. The distance between the center heights of the beams depends on the product model, and should not exceed mm. The beam height should be mm, and the thickness should be the same as the wall. The lower ring beam is -mm away from the bottom of the pit, and the higher ring beam is -mm away from the lower surface of the shaft roof. The completed framework with a solid brick structure shaft can be equipped with steel plywood at the position of the fixed guide rail support frame. The position and size of the plywood are provided by the elevator, and the user is responsible for providing materials and construction. If the shaft structure is made of hollow bricks without ring beams,YingzeStage style lifting platform, and depth of the pit (if any), and observe whether there are grooves and embedded parts at the support beam.The compensation chain and rope shall not collide with the shaft or other components during the operation of the elevator.


YingzeAluminum alloy high-altitude lifting platformWhat are the basic conditions



There is a dedicated fire telephone in the fire elevator car.Elevator does not close the door or repeatedly opens and closes the door: there are debris blocking the light curtain or door contact plate at the entrance or sill.To implement the arrangement of escalators and provide feedback, in order to determine the configuration of certain shared devices, the order of shipment, and the alignment of handrail turns during continuous arrangement.market,Measurement of elevator and escalator shafts (III)The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition,YingzeAluminum alloy high-altitude lifting platform, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side,YingzeAccessible lifting platform, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


YingzeAluminum alloy high-altitude lifting platformWhat are the basic conditions



Attention: The elevator consists of two main parts: mechanical and electrical. If the elevator is not maintained on a daily basis, its safety cannot be guaranteed. If the elevator needs to be refueled without refueling, it will cause wear and tear on the mechanical components of the elevator, greatly shortening its service life and preventing normal use of the elevator.Market trend,The door closing button has no self maintenance function. During the designated maintenance period, the elevator components in operation are inspected, refueled, dust is removed, and safety devices are debugged. Including non-destructive testing and maintenance of elevator traction steel wire ropes.Elevator Tip : Why elevators can trap people? Every elevator door on each floor has a safety switch, which can trigger the elevator to shut down in case of any abnormality. The elevator getting stuck is actually when the system detects an abnormal signal and triggers a protective device, like braking to stop.If the elevator is already on the first floor, immediately open the elevator door and enter the firefighter's dedicated state.Yingze,Machine room power supply: The power supply should be three-phase V, HZ, and the lighting power supply should be single-phase V, HZ. The incoming line should be connected to the vicinity of the machine room entrance and equipped with an incoming socket. Specializing in product and renewable resource business, including: home elevator manufacturersWhen the normal power supply is cut off, while there is still lighting inside the fire elevator.In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.


404 Not Found

404 Not Found


nginx

Related articles

Nuevo LaredoVertical heavy-duty slurry pumpWholesale preferred

Nuevo LaredoVertical heavy-duty slurry pumpWholesale preferred

  As a submersible slurry pump widely used in many fields, it has the advantages of simple structure...

Buster12 meter aluminum alloy lifting platformInstallation coordination attention elements

Buster12 meter aluminum alloy lifting platformInstallation coordination attention elements

Check the protective cable condition of the cable guide frameCheck the fastening status of the wall...

Miyori800 oil immersed transformerCareful use needs to be implemented many times

Miyori800 oil immersed transformerCareful use needs to be implemented many times

Analysis of common faults of oil immersed transformer:Wiring mode of dry-type transformer:Miyori, th...

Rimini3-meter hydraulic lifting platformHow to dismantle

Rimini3-meter hydraulic lifting platformHow to dismantle

Loose motor fixing screws: When the motor fan rotates, there is a sound. If the screws fixing the mo...

SeihbergLight hydraulic lifting platformFormalized development

SeihbergLight hydraulic lifting platformFormalized development

What are the common faults of the hydraulic lifting platform. The oil cylinder load of the hydraulic...

PesackPrice of 5-story household elevatorThe utility of machinery is increasingly prominent

PesackPrice of 5-story household elevatorThe utility of machinery is increasingly prominent

b. When the old elevator cannot start: due to the inability to enter the shaft, limited data can onl...

评论列表

161HP196399230
2023-12-02 12:13:31

The manager is nice! YingzeAluminum alloy high-altitude lifting platform is also real.

391HP142030639
2023-12-02 12:24:03

This store is really good, with good quality and low price, the owner is very generous, and the customer service is also very patient. I don’t understand this YingzeAluminum alloy high-altitude lifting platform. They explain to me patiently. It is really the conscience of the industry. I want to recommend this shop to my friends and let them all come to this shop to buy clothes!

173HP199071655
2023-12-02 12:34:36

YingzeAluminum alloy high-altitude lifting platformVery good, very supportive, very good quality, exactly the same as described by the seller, and the price is cheap

122HP117294921
2023-12-02 12:12:15

Yes, YingzeAluminum alloy high-altitude lifting platform good quality and great value for money

717HP127443542
2023-12-02 12:08:45

Every time I receive the goods is very pleasant, but as long as I think of evaluating it, my head is big. Fortunately, a omnipotent friend recommended your home YingzeAluminum alloy high-altitude lifting platform, the price is good, the quality is good, the delivery is good, and the boss is good.

632HP195506591
2023-12-02 12:58:41

I will find you again next time I have the opportunity.

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。