FuSemi electric high-altitude reclaimerBest process parameters

2023-10-24 18:46:58

The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.Fu,FuStage curtain elevator,When passengers are riding on the escalator, they may lose their balance and fall due to leaning against the skirt board on the side of the escalator which does not move, but their feet move with the steps. Especially when carrying a lot of packages while taking the elevator, it is more likely to fall on the escalator due to the inability to hold the handrail properly. So, when riding on the escalator, we must stand firmly and support it well, and do not lean against the skirt board on the side of the escalator.The household must make two steel splints above the entrance. The position and size of the clamp plate are determined based on the selected door machine model.Lojo,In the event of a fire, when instructed by the fire center or the dedicated operation button of the first floor firefighter to enter the firefighting state, the elevator should immediately stop on the floor without opening the door, return to the first floor station, and automatically open the elevator door if it is in the upward direction.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.There is a dedicated fire telephone in the fire elevator car.


FuSemi electric high-altitude reclaimerBest process parameters



The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case,FuHousehold indoor elevator small, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).Overloaded elevators do not operate: The load of elevators is limited, and if they are overweight, they will alarm and generally cannot be started. Most passengers can also voluntarily exit.Measurement of elevator and escalator shafts (III)For more, please check,If the elevator is in a downward direction,FuAluminum alloy high-altitude lifting platform, immediately close the door and return to the first floor station, and automatically open the elevator door.During the use of elevators, some elevator users seek temporary workers or unqualified companies for elevator maintenance in order to reduce costs and save funds. Once safety issues arise, even the responsible unit cannot be found. If the maintenance is carried out by elevator manufacturers or qualified professional companies, on the one hand, the maintenance technology and quality are guaranteed and on the other hand, if any problems occur, someone is also responsible.The shaft for updating the old elevator: The measurement of the shaft for the old elevator is the same as the shaft that has just been constructed. When the old elevator is not yet in use, try to obtain relevant data outside the shaft, such as the size of the machine room, floor height, and net size of the door opening. There are two situations when the old elevator is not yet in use: a. When the old elevator can start: in this case, the elevator technician must cooperate in measuring the shaft! And be sure to pay attention to safety! The elevator technician opens the hall door on the first floor and initiates maintenance operations to drive the car above the second floor. The measurement personnel open the floor door on the first floor to measure the pit data, paying attention to recording the pit size and the wall structure of the first floor, such as whether the hall door is centered, whether there are brackets, whether there are special structures on the shaft wall, the spacing between ring beams, and the position of embedded parts. Then, the measuring personnel and elevator technicians take the elevator to the top floor. After measuring the machine room, the measuring personnel, with the cooperation of the technicians, go up to the car roof and start the elevator at a maintenance speed. When the car roof is slightly lower than the sill of the second floor hall door, the parking lot stops. During this process, the measuring personnel observe and measure the full travel of the shaft from the top floor, mainly the height of the floor, while recording the measurement (safety must be paid attention to, and special attention should be paid to moving parts such as counterweights and wire ropes).


FuSemi electric high-altitude reclaimerBest process parameters



Restore the command button function in the cabin for firefighters to operate.Marketing Department,Tower style residential buildings above; Residential units and corridors with twelve or more floors; Other Class II public buildings with a building height exceeding meters; High rise buildings with elevators exceeding meters in height; The functional fire elevator has a front room. The area of the independent fire elevator front room is: the front room area of the residential building is greater than square meters; The front room area of public buildings and high-rise factory (warehouse) buildings is greater than square meters. When the front room of the fire elevator is shared with the smoke proof staircase its area is: the area of the shared front room in residential buildings is greater than square meters, and the area of the shared front room in public buildings and high-rise factory (warehouse) buildings is greater than square meters.The braking system of the elevator is usually closed, which means it is in the braking state when there is no power, and only when it needs to be turned on, the brakes closed and the elevator was braked in mid air. When the elevator descends abnormally, cut off the power and the elevatorb. When the old elevator cannot start: due to the inability to enter the shaft, the plane size of the shaft can be measured in the machine room, but it is not accurate enough) for elevator quotation negotiation reference. In this case, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.Fu,Electrical safety. Faulty elevators have multiple safety devices, but there are also many places where problems can occur. Some people have been caught due to abnormal door opening and closing while others have encountered situations where elevator buttons malfunction and the display screen is black, making it difficult to see the floor clearly. Some have experienced the danger of falling straight several floors. Although there may not have been any personal injury, taking the elevator is not about finding or acting in a movie. The real life is disturbed by the frequent elevator accidents, which make my heart feel uneasyb. When the old elevator cannot start: due to the inability to enter the shaft, limited data can only be obtained from outside the shaft to determine whether it is non-standard (if there is a high platform in the machine room, the plane size of the shaft can be measured in the machine room, the signing of the contract should state that the shaft rectification and costs are the responsibility of the user. For uncertain shaft structures and dimensions, users should be reminded to provide them to the elevator after the old elevator or notify the elevator to take measurements before the new elevator is put into operation.The treatment of general civil engineering problems on escalator sites: the beam edge distance is too large: in this case, the length of the upper and lower platforms of the escalator can be increased to meet the actual dimensions of civil engineering. One platform can be extended on one side, or both platforms can be extended simultaneously. The total extension of the upper and lower platforms should generally not exceed mm. When lengthening the platform, attention should be paid to the length of the pit or the opening of the floor slab, which should also be lengthened at the same time. After the escalator is extended, the force on the upper and lower support points will also increase. If the edge distance of the beam increases too long, support needs to be added in the middle of the escalator truss. In addition, changing the angle of the escalator from degrees to degrees can also make the beam edge distance longer.


404 Not Found

404 Not Found


nginx

Related articles

FuSemi electric high-altitude reclaimerHow long will the confusion in the market last?

FuSemi electric high-altitude reclaimerHow long will the confusion in the market last?

The front room of the fire elevator is equipped with Class B fireproof doors or fireproof rolling sh...

评论列表

938HP166090698
2023-10-24 20:27:08

When FuSemi electric high-altitude reclaimer offer discount points for activities, contact me when there are discounts

466HP159575805
2023-10-24 19:07:41

Dear, FuSemi electric high-altitude reclaimer I received it, I love it very much, the workmanship is nothing to say, haha, the service attitude is also super good, a very caring seller, I will frequent it in the future.

263HP145816628
2023-10-24 20:34:35

The first time I found what I wanted FuSemi electric high-altitude reclaimer, I was in a good mood! Boss, come on, I hope to continue to make good products.

709HP180518493
2023-10-24 19:26:51

I didn’t expect online shopping to be so interesting. Under the guidance of the seller, I finally learned online FuSemi electric high-altitude reclaimer, thank you!

发表评论    

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。